Yankee (YK) line: Difference between revisions
| Revision as of 04:18, 24 November 2026 claude (Transitica is the world; Greenfield is its capital city) | Revision as of 22:57, 24 November 2026 claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages) | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | --- | ||
| + | infobox: | ||
| + | Operator: "[[Metropolitan Atlanta Rapid Transit Authority]]" | ||
| + | Yard (route profile): "Avondale" | ||
| + | Ideal rolling stock: "LA Metro (Hyundai Rotem) HR5000" | ||
| + | --- | ||
| + | {{route}} | ||
| + | |||
## History | ## History | ||
| − | In the [[Transitica route profiles]], an older planning document that is now out of date, this line was the '''MARTA Yankee Line''' (<span class="chip" style="background:#54ff8a;color:#fff;border-radius:.8em;min-width:1.6em">YK</span>), a subway line of the [[Metropolitan Atlanta Rapid Transit Authority]] with 13 stations between Bankhead and Takoma. Its ideal rolling stock was the LA Metro (Hyundai Rotem) HR5000 (8 cars). It was based at the Avondale yard. It shared track with the Tango line between Ashby and Takoma. | + | In the [[Transitica route profiles]], an older planning document, this line was the '''MARTA Yankee Line''' (<img class="chip-img" src="/images/bullet-yankee.png" alt="YK" loading="lazy">), a subway line of the [[Metropolitan Atlanta Rapid Transit Authority]] with 13 stations between Bankhead and Takoma. |
| − | The full old route profile is at [[Yankee line (route profile)]]. | + | ## Route profile |
| + | |||
| + | The route profile still matches the line today: the same 13 stations, between the same termini. | ||
| + | |||
| + | ### Operations in the route profile | ||
| + | |||
| + | - '''Yard:''' Avondale (see [[Yards and depots]]). | ||
| + | - '''Shared track''' with <a href="/wiki/Tango_%28TG%29_line" class="chip-link" title="Tango (TG) line"><img class="chip-img" src="/images/bullet-tango.png" alt="TG" loading="lazy"></a> [[Tango (TG) line]] between Ashby and Takoma (see [[Interlined lines]]). | ||
| + | |||
| + | ## Ideal rolling stock | ||
| + | |||
| + | The route profile chose this real-world train for the line (see [[Transitica rolling stock]]): | ||
| + | |||
| + | ### LA Metro (Hyundai Rotem) HR5000 | ||
| + | |||
| + |  | ||
| + | |||
| + | - Cars: 8 | ||
| + | - Car Length: 22.86 m (75 ft) | ||
| + | - Platform Length: 181 m (593.8 ft) | ||
| + | |||
Revision as of 22:57, 24 November 2026
| Yankee (YK) | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | YK |
| Type | Rapid transit |
| Color | #54FF8A |
| Operator | Metropolitan Atlanta Rapid Transit Authority |
| Yard (route profile) | Avondale |
| Ideal rolling stock | LA Metro (Hyundai Rotem) HR5000 |
| Termini | Takoma Bankhead |
| Stations | 13 |
| Length | 17,119 blocks (17.1 km) |
| Dimension | minecraft/overworld |
The Yankee (YK) Line, numbered YK, is a subway line part of the Metropolitan Atlanta Rapid Transit Authority in the Transitica Railway Network. It runs between Takoma and Bankhead, serving 13 stations over about 17.1 km.
Contents
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Takoma | ![]() | 3 | 0.0 | |
| Avondale | ![]() | ▼2 ▲3 | 1.2 | |
| Decatur | ![]() | ▼1 ▲2 | 2.6 | |
| East Lake | ![]() | ▼1 ▲2 | 4.8 | |
| Edgewood/Candler Park | ![]() | ▼1 ▲2 | 7.3 | |
| Inman Park/Reynoldstown | ![]() | ▼1 ▲2 | 8.5 | |
| King Memorial | ![]() | ▼1 ▲2 | 11.0 | |
| Georgia State | ![]() | ▼1 ▲2 | 12.0 | |
| Five Points | ![]() | ▼3 ▲4 | 12.6 | |
| GWCC/CNN Center | ![]() | ▼1 ▲2 | 13.2 | |
| Vine City | ![]() | ▼1 ▲2 | 13.8 | |
| Ashby | ![]() | ▼1 ▲2 | 15.1 | |
| Bankhead | ▼2 ▲1 | 17.1 |
History
In the Transitica route profiles, an older planning document, this line was the MARTA Yankee Line (
), a subway line of the Metropolitan Atlanta Rapid Transit Authority with 13 stations between Bankhead and Takoma.
Route profile
The route profile still matches the line today: the same 13 stations, between the same termini.
Operations in the route profile
- Yard: Avondale (see Yards and depots).
- Shared track with
Tango (TG) line between Ashby and Takoma (see Interlined lines).
Ideal rolling stock
The route profile chose this real-world train for the line (see Transitica rolling stock):
LA Metro (Hyundai Rotem) HR5000

- Cars: 8
- Car Length: 22.86 m (75 ft)
- Platform Length: 181 m (593.8 ft)


