Transitica Wikithe Transitica encyclopedia
Log in

Tango (TG) line

From Transitica Wiki, the Transitica encyclopedia
Tango (TG)
Line of the Transitica Railway Network
NumberTG
TypeRapid transit
Color #3472D5
OperatorMetropolitan Atlanta Rapid Transit Authority
Rolling stockLA Metro (CRRC) HR4000
TerminiTakoma
Hamilton E. Holmes
Stations14
Length19,905 blocks (19.9 km)
Dimensionminecraft/overworld

The Tango (TG) Line, numbered TG, is a subway line part of the Metropolitan Atlanta Rapid Transit Authority in the Transitica Railway Network. It runs between Takoma and Hamilton E. Holmes, serving 14 stations over about 19.9 km.

Route

StationConnectionsPlatformskm
TakomaZU YK40.0
AvondaleYK▼1 ▲41.2
DecaturYK▼1 ▲22.6
East LakeYK▼1 ▲24.8
Edgewood/Candler ParkYK▼1 ▲27.3
Inman Park/ReynoldstownYK▼1 ▲28.5
King MemorialYK▼1 ▲211.0
Georgia StateYK▼1 ▲212.0
Five PointsFX YK SR▼3 ▲412.6
GWCC/CNN CenterYK▼1 ▲213.2
Vine CityYK▼1 ▲213.9
AshbyYK▼1 ▲215.1
West Lake▼1 ▲217.7
Hamilton E. Holmes▼1 ▲219.9

History[edit]

The line was first planned as the MARTA Tango Line (TG), a subway line of the Metropolitan Atlanta Rapid Transit Authority with 14 stations between Hamilton E. Holmes and Takoma.

Operations[edit]

Rolling stock[edit]

The line's trains are modelled on the LA Metro (CRRC) HR4000 (see Transitica rolling stock).

LA Metro (CRRC) HR4000

History[edit]

The HR4000 is a heavy-rail car for LA Metro's subway, the B Line (formerly Red) and D Line (formerly Purple), built by CRRC MA, which also built new cars for Boston. Sixty-four cars (4001–4064) have been built since 2021 and entered passenger service in 2024. The order was hit by construction delays and by the Uyghur Forced Labor Prevention Act of 2021, and Metro decided not to buy the option cars, ordering the Hyundai Rotem HR5000 instead. The HR4000s work alongside the Breda A650 cars the subway opened with in 1993.

Design and features[edit]

Like the A650s, the HR4000s are 75-foot cars run as married pairs on 750 V DC third rail, usually in four- or six-car trains, and they are kept at Division 20 yard.

Specifications[edit]

Real-world trainIn Transitica
ManufacturerCRRC MA
Built2021–2024
Entered service2024
Number built64 cars
Car length22.86 m (75 ft)22.86 m (75 ft)
Formationmarried pairs, run as 4 or 6 cars
Cars per train8
Electric system750 V DC third rail
Platform length181 m (593.8 ft)

In Transitica[edit]

The Tango line is built to LA Metro's subway standard, and MARTA ordered its trains on LA's HR4000 contract with CRRC. They were delayed by the same construction problems and the 2021 forced-labour law, and like LA Metro, MARTA decided not to buy any more of them.

Source: Los Angeles Metro Rail rolling stock on Wikipedia.