Transitica Wikithe Transitica encyclopedia
Log in

Vanadium (VD) line: Difference between revisions

Revision as of 20:23, 25 November 2026
claude (Seoul trains: rewrite rolling stock sections from Namu Wiki)
Revision as of 20:26, 25 November 2026
claude (Rolling stock: in-world history of how each line's agency got its trains, tied to the real orders)
Line 34:Line 34:
+
SMRT bought the newest dual-voltage 4000-series trains, ordered alongside Seoul Metro's fifth batch from Woojin Industrial Systems.
+
 

Revision as of 20:26, 25 November 2026

Vanadium (VD)
Line of the Transitica Railway Network
NumberVD
TypeRapid transit
Color #33D4DC
OperatorSeogyeong Mass Rapid Transit
Rolling stockSeoul Metro 4000 series (fifth generation)
TerminiSeogyeong West
Seogyeong City Airport ✈
Stations3
Length1,797 blocks (1.8 km)
Dimensionminecraft/overworld

The Vanadium (VD) Line, numbered VD, is a subway line part of Seogyeong Mass Rapid Transit in the Transitica Railway Network. It runs between Seogyeong West and Seogyeong City Airport ✈, serving 3 stations over about 1.8 km.

Route

StationConnectionsPlatformskm
Seogyeong West▼2 ▲10.0
SeogyeongZU CR▼B ▲A1.1
Seogyeong City Airport ✈TI▼2 ▲11.8

History

The line was first planned as the SMRT Vanadium Line (VD), a subway line of the Seogyeong Mass Rapid Transit with 3 stations between 서경서부 (Seogyeong West) and 서경공항 (Seogyeong City Airport).

Rolling stock

The line's trains are modelled on the Seoul Metro 4000 series (fifth generation) (see Transitica rolling stock).

Seoul Metro 4000 series (fifth generation)

History

Seoul Subway Line 4's 4000-series trains were Seoul's first VVVF trains: the first batch, built by Hyundai Precision in 1993, and the second, by Daewoo Heavy Industries in 1994–1995. No new trains came for 25 years, until Hyundai Rotem built five trains (50 cars) in 2020 for the Jinjeop Line extension; those are owned by the national government. Hyundai Rotem won that order by undercutting the expected winner at about 870 million won a car.

Replacement of the 1990s trains then began. Dawonsys built a fourth batch of 21 trains in 2023–2025, and Woojin Industrial Systems (Woojin Sanjeon) a fifth batch in 2024–2025, with a sixth from Woojin planned for 2027. The newest trains are modelled here.

Design and features

Line 4 changes from 1,500 V DC inside Seoul to Korail's 25 kV 60 Hz AC on the Gwacheon and Ansan lines, so its trains must run on both. The 2020 Jinjeop batch shares the look of the Line 2 fourth batch, with a streamlined front and full-height windows, and the newer trains all use IGBT inverter drives and regenerative braking with Knorr electrically commanded air brakes. The cabs on the 2020 batch already have an ATO start button in case automatic operation is brought to Line 4. Because Line 4 is so busy, the air conditioning runs all year round.

Specifications

Real-world train
ManufacturerWoojin Industrial Systems (5th batch); Dawonsys (4th); Hyundai Rotem (3rd)
Built2024–2025 (5th batch)
Formation10 cars
Car length19.5 m (64 ft)
Width3.12 m (10 ft 3 in)
Doors4 pairs per side
TractionVVVF–IGBT
Brakingregenerative and Knorr electrically commanded air brakes
Electric system1,500 V DC and 25 kV 60 Hz AC overhead line
SignallingUS&S (Hitachi Rail STS) ATC, ATS
Track gauge1,435 mm (4 ft 8½ in)

In Transitica

SMRT bought the newest dual-voltage 4000-series trains, ordered alongside Seoul Metro's fifth batch from Woojin Industrial Systems.

How the line's trains are set up in the game:

  • Cars: 4
  • Car Length: 19.5
  • Platform Length: 90 m

Source: 서울교통공사 4000호대 VVVF 전동차 on Namu Wiki (in Korean).