Transitica Wikithe Transitica encyclopedia
Log in

Titanium (TI) line: Difference between revisions

Revision as of 03:21, 24 November 2026
claude (Add the Transitica route-profile document (outdated) to the wiki)
Revision as of 20:55, 25 November 2026
claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica))
Line 1:Line 1:
+
---
+
infobox:
+
Operator: "[[Seogyeong Mass Rapid Transit]]"
+
Rolling stock: "Seoul Metro 3000 series (second generation, second batch) (Dawonsys)"
+
---
+
{{route}}
+
 
## History
## History
 
 
−
In the [[Transitica]] plan, an older route-profile document for this world that is now out of date, this line was the '''SMRT Titanium Line''' (<span class="chip" style="background:#42bf30;color:#fff;border-radius:.8em;min-width:1.6em">TI</span>), a subway line of the [[Seogyeong Mass Rapid Transit]] with 3 stations between 지초 (Jicho) and 서경공항 (Seogyeong City Airport). Its ideal rolling stock was the Seoul Metro 3000 series (second generation, second batch) (Dawonsys) (3 cars).
+
The line was first planned as the '''SMRT Titanium Line''' (<img class="chip-img" src="/images/bullet-titanium.png" alt="TI" loading="lazy">), a subway line of the [[Seogyeong Mass Rapid Transit]] with 3 stations between 지초 (Jicho) and 서경공항 (Seogyeong City Airport).
 
 
−
The full old route profile is at [[Titanium line (Transitica)]].
+
## Rolling stock
+
 
+
The line's trains are modelled on the '''Seoul Metro 3000 series (second generation, second batch) (Dawonsys)''' (see [[Transitica rolling stock]]).
+
 
+
![Seoul Metro 3000 series (second generation, second batch) (Dawonsys)](/images/Transitica_Seoul_Metro_3000_series_second_generation_second_batch_Dawon.jpg)
+
 
+
### History
+
 
+
Seoul Subway Line 3's VVVF-controlled 3000-series trains came in two batches. Hyundai Rotem built the first, 34 trains, in 2009–2010. The second batch, modelled here, was built by Dawonsys in 2021–2022: 150 cars making 15 ten-car trains, ordered to replace every remaining chopper-controlled 3000-series train, the old GEC-equipped trains of 1990–1993. The first of them, set 316, went into service in 2021; the rest were held back for months of test running because of brake faults, and in December 2023 a fire broke out in the heating and air-conditioning switchboard of set 347 while it was parked at Suseo depot. The trains are kept at Jichuk and Suseo depots, and a third batch is planned for around 2032.
+
 
+
### Design and features
+
 
+
The second batch is a sister design of the Dawonsys-built Line 2 trains (the 2000 series' third and fifth batches): apart from the styling, the signalling and the radio equipment for platform screen doors, the specification is the same, and they sound alike too. The bodies are aluminium, the drive is Dawonsys's own IGBT inverter with AC induction motors, and the brakes combine regenerative and electrically commanded air braking. Seats are laid out 3-6-6-6-3 along each side. Namu Wiki notes the cars vibrate rather more than the first batch, even though they are newer.
+
 
+
### Specifications
+
 
+
<table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Dawonsys</td><td></td></tr><tr><th>Built</th><td>2021–2022</td><td></td></tr><tr><th>Entered service</th><td>2021</td><td></td></tr><tr><th>Number built</th><td>150 cars (15 ten-car trains)</td><td></td></tr><tr><th>Formation</th><td>10 cars</td><td></td></tr><tr><th>Cars per train</th><td></td><td>3</td></tr><tr><th>Car body</th><td>aluminium</td><td></td></tr><tr><th>Car length</th><td>19.95 m (end cars); 19.5 m (middle cars)</td><td>19.5 m</td></tr><tr><th>Width</th><td>3.12 m (10 ft 3 in)</td><td></td></tr><tr><th>Height</th><td>3.75 m (12 ft 4 in)</td><td></td></tr><tr><th>Doors</th><td>4 pairs per side</td><td></td></tr><tr><th>Seating</th><td>bench seats, 3-6-6-6-3 per side</td><td></td></tr><tr><th>Maximum speed</th><td>80 km/h (50 mph) in service; 100 km/h design</td><td></td></tr><tr><th>Traction</th><td>Dawonsys VVVF–IGBT, 3-phase AC induction motors (gear ratio 14:99)</td><td></td></tr><tr><th>Electric system</th><td>1,500 V DC overhead line</td><td></td></tr><tr><th>Signalling</th><td>US&amp;S (Hitachi Rail STS) ATC</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Platform length</th><td></td><td>60 m</td></tr></table>
+
 
+
### In Transitica
+
 
+
Seogyeong Mass Rapid Transit took part in the same 2021 tender as Seoul Metro's Line 3 replacement trains, and its Titanium line order also went to Dawonsys. Its trains share the Seoul batch's brake problems and long test running before entering service.
+
 
+
<p class="rs-source">Source: <a href="https://namu.wiki/w/%EC%84%9C%EC%9A%B8%EA%B5%90%ED%86%B5%EA%B3%B5%EC%82%AC%203000%ED%98%B8%EB%8C%80%20VVVF%20%EC%A0%84%EB%8F%99%EC%B0%A8" rel="noopener">서울교통공사 3000호대 VVVF 전동차</a> on Namu Wiki (in Korean).</p>

Revision as of 20:55, 25 November 2026

Titanium (TI)
Line of the Transitica Railway Network
NumberTI
TypeRapid transit
Color #42BF30
OperatorSeogyeong Mass Rapid Transit
Rolling stockSeoul Metro 3000 series (second generation, second batch) (Dawonsys)
TerminiSeogyeong City Airport ✈
Jicho
Stations3
Length741 blocks (0.7 km)
Dimensionminecraft/overworld

The Titanium (TI) Line, numbered TI, is a subway line part of Seogyeong Mass Rapid Transit in the Transitica Railway Network. It runs between Seogyeong City Airport ✈ and Jicho, serving 3 stations over about 0.7 km.

Route

StationConnectionsPlatformskm
Seogyeong City Airport ✈VD▼3 ▲40.0
Haneul▼1 ▲20.4
JichoCR▼2 ▲10.7

History

The line was first planned as the SMRT Titanium Line (TI), a subway line of the Seogyeong Mass Rapid Transit with 3 stations between 지초 (Jicho) and 서경공항 (Seogyeong City Airport).

Rolling stock

The line's trains are modelled on the Seoul Metro 3000 series (second generation, second batch) (Dawonsys) (see Transitica rolling stock).

Seoul Metro 3000 series (second generation, second batch) (Dawonsys)

History

Seoul Subway Line 3's VVVF-controlled 3000-series trains came in two batches. Hyundai Rotem built the first, 34 trains, in 2009–2010. The second batch, modelled here, was built by Dawonsys in 2021–2022: 150 cars making 15 ten-car trains, ordered to replace every remaining chopper-controlled 3000-series train, the old GEC-equipped trains of 1990–1993. The first of them, set 316, went into service in 2021; the rest were held back for months of test running because of brake faults, and in December 2023 a fire broke out in the heating and air-conditioning switchboard of set 347 while it was parked at Suseo depot. The trains are kept at Jichuk and Suseo depots, and a third batch is planned for around 2032.

Design and features

The second batch is a sister design of the Dawonsys-built Line 2 trains (the 2000 series' third and fifth batches): apart from the styling, the signalling and the radio equipment for platform screen doors, the specification is the same, and they sound alike too. The bodies are aluminium, the drive is Dawonsys's own IGBT inverter with AC induction motors, and the brakes combine regenerative and electrically commanded air braking. Seats are laid out 3-6-6-6-3 along each side. Namu Wiki notes the cars vibrate rather more than the first batch, even though they are newer.

Specifications

Real-world trainIn Transitica
ManufacturerDawonsys
Built2021–2022
Entered service2021
Number built150 cars (15 ten-car trains)
Formation10 cars
Cars per train3
Car bodyaluminium
Car length19.95 m (end cars); 19.5 m (middle cars)19.5 m
Width3.12 m (10 ft 3 in)
Height3.75 m (12 ft 4 in)
Doors4 pairs per side
Seatingbench seats, 3-6-6-6-3 per side
Maximum speed80 km/h (50 mph) in service; 100 km/h design
TractionDawonsys VVVF–IGBT, 3-phase AC induction motors (gear ratio 14:99)
Electric system1,500 V DC overhead line
SignallingUS&S (Hitachi Rail STS) ATC
Track gauge1,435 mm (4 ft 8½ in)
Platform length60 m

In Transitica

Seogyeong Mass Rapid Transit took part in the same 2021 tender as Seoul Metro's Line 3 replacement trains, and its Titanium line order also went to Dawonsys. Its trains share the Seoul batch's brake problems and long test running before entering service.

Source: 서울교통공사 3000호대 VVVF 전동차 on Namu Wiki (in Korean).