Teal line: Difference between revisions
| Revision as of 03:21, 24 November 2026 claude (Add the Transitica route-profile document (outdated) to the wiki) | Revision as of 20:55, 25 November 2026 claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica)) | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | --- | ||
| + | infobox: | ||
| + | Operator: "[[Greenfield Transit Authority]]" | ||
| + | Division: "GTA Commuter Rail" | ||
| + | Rolling stock: "MNR M9A" | ||
| + | --- | ||
| + | {{route}} | ||
| + | |||
## History | ## History | ||
| − | In the [[Transitica]] plan, an older route-profile document for this world that is now out of date, this line was the '''GTA Teal Line''' (<span class="chip" style="background:#008080;color:#fff;border-radius:.8em;min-width:1.6em">TL</span>), a commuter rail line of the [[Greenfield Transit Authority]] with 31 stations between 新鶴川 (Shintsurukawa) and Medford. Its ideal rolling stock was the MNR M9A (3 cars). It was based at the East Dawson and Greenfield Central yards. It shared track with the Ruby line and Sapphire line between Washington & Wells and Harold Washington Library. On the Hastings Junction – Medford corridor it ran local. | + | The line was first planned as the '''GTA Teal Line''' (<img class="chip-img" src="/images/bullet-teal.png" alt="TL" loading="lazy">), a commuter rail line of the [[Greenfield Transit Authority]] (GTA Commuter Rail) with 31 stations between 新 鶴川 (Shintsurukawa) and Medford. |
| − | The full old route profile is at [[Teal line (Transitica)]]. | + | Luton Village West has since been renamed [[Hedgebury-Luton Village West]]; Luton Village East has since been renamed [[Dunham Mile-Luton Village East]]; Oxstead South has since been renamed [[Oxstead]]; Harold Washington Library has since been renamed [[Harold Washington Library & Jackson]]. |
| + | |||
| + | ## Operations | ||
| + | |||
| + | - '''Hastings Junction – Medford corridor:''' runs local, serving all stops; shares the corridor with <a href="/wiki/M1_line" class="chip-link" title="M1 line"><img class="chip-img" src="/images/bullet-m1.png" alt="M1" loading="lazy"></a> [[M1 line]] (express) (see [[Express and local sections]]). | ||
| + | - '''Shared track''' with <a href="/wiki/Sapphire_line" class="chip-link" title="Sapphire line"><img class="chip-img" src="/images/bullet-sapphire.png" alt="SA" loading="lazy"></a> [[Sapphire line]] between Washington & Wells and Harold Washington Library (see [[Interlined lines]]). | ||
| + | |||
| + | ## Rolling stock | ||
| + | |||
| + | The line's trains are modelled on the '''MNR M9A''' (see [[Transitica rolling stock]]). | ||
| + | |||
| + |  | ||
| + | |||
| + | ### History | ||
| + | |||
| + | Metro-North chose in 2018 not to take up its options on the LIRR's Kawasaki M9 order, and overhauled its M3A cars instead while it worked with the LIRR on a new order. In June 2025 the MTA approved about $2.3 billion for 316 M9A cars, 156 for Metro-North and 160 for the LIRR, and the contract went to Alstom on 23 June 2025. They are being built at Hornell and Plattsburgh, New York, and will replace Metro-North's remaining M3As on the Hudson and Harlem lines. | ||
| + | |||
| + | ### Design and features | ||
| + | |||
| + | Like the M9, the cars run as married pairs. Compared with the M7 they have wider seats, closed-loop armrests like the M8's, power outlets at every row and four to six extra seats per pair. Each car has four 32-inch screens, destination signs that show which car you are in ("Car 1 of 8"), outside speakers, CCTV and positive train control. Flip-up seats are damped so they don't slam. The M9A adds USB ports at every outlet, powered toilet doors, stainless-steel urinals and Gorilla Glass side windows, and uses an Alstom MITRAC IGBT drive in place of the M9's Mitsubishi equipment. | ||
| + | |||
| + | ### Specifications | ||
| + | |||
| + | <table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Alstom (Hornell and Plattsburgh, New York)</td><td></td></tr><tr><th>Built</th><td>2025–present</td><td></td></tr><tr><th>Status</th><td>on order</td><td></td></tr><tr><th>Number ordered</th><td>316 cars (156 for Metro-North)</td><td></td></tr><tr><th>Formation</th><td>married pairs</td><td></td></tr><tr><th>Cars per train</th><td></td><td>3</td></tr><tr><th>Operator</th><td>Metro-North Railroad, Long Island Rail Road</td><td></td></tr><tr><th>Traction</th><td>Alstom MITRAC IGBT–VVVF</td><td></td></tr><tr><th>Car length</th><td>25.9 m (85 ft)</td><td>25.9 m (85 ft)</td></tr><tr><th>Width</th><td>3.25 m (10 ft 8 in)</td><td></td></tr><tr><th>Height</th><td>3.95 m (12 ft 11.6 in)</td><td></td></tr><tr><th>Maximum speed</th><td>129 km/h (80 mph) in service; 161 km/h (100 mph) design</td><td>129 km/h (100 mph)</td></tr><tr><th>Capacity</th><td>101–111 seated per car</td><td></td></tr><tr><th>Electric system</th><td>750 V DC third rail</td><td>third rail, 750 V DC</td></tr><tr><th>Signalling</th><td>ATC, pulse-code cab signalling, PTC</td><td></td></tr><tr><th>Platform length</th><td></td><td>80 m (262.5 ft)</td></tr><tr><th>Acceleration</th><td></td><td>1.1 m/(h*s) (2 mph/s)</td></tr><tr><th>Deceleration</th><td></td><td>1.3 m/(h*s) (3 mph/s)</td></tr></table> | ||
| + | |||
| + | ### In Transitica | ||
| + | |||
| + | The Teal line is waiting for the M9A. Like Metro-North, the GTA turned down its M9 options in 2018 and kept its older cars running, then joined the joint Metro-North and LIRR order that went to Alstom in June 2025. The line's trains follow the M9A design, with USB ports at every seat and Gorilla Glass windows, built at Hornell and Plattsburgh. | ||
| + | |||
| + | <p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/M9_(railcar)" rel="noopener">M9 (railcar)</a> on Wikipedia.</p> | ||
Revision as of 20:55, 25 November 2026
| Teal | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | TL |
| Type | High-speed rail |
| Color | #008080 |
| Operator | Greenfield Transit Authority |
| Division | GTA Commuter Rail |
| Rolling stock | MNR M9A |
| Termini | Shin-Tsurukawa Medford |
| Stations | 31 |
| Length | 31,241 blocks (31.2 km) |
| Dimension | minecraft/overworld |
The Teal Line, numbered TL, is a commuter rail line part of the Greenfield Transit Authority in the Transitica Railway Network. It runs between Shin-Tsurukawa and Medford, serving 31 stations over about 31.2 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Shin-Tsurukawa | ![]() | ▼2 ▲1 | 0.0 | |
| Kitamori | ![]() | ▼1 ▲3 | 1.8 | |
| Karitsuki | ![]() | ▼6 ▲5 | 3.4 | |
| Old Stanley | ![]() | ▼4 ▲3 | 4.5 | |
| Hedgebury-Luton Village West | ![]() | ▼B ▲A | 4.8 | |
| Dunham Mile-Luton Village East | ![]() | ▼B ▲A | 5.2 | |
| Oxstead | ![]() | ▼B ▲C | 5.6 | |
| Tranton Union Terminal | ![]() | ▼3 ▲2 | 6.1 | |
| Eastern Waterfront | ![]() | ▼3 ▲2 | 6.7 | |
| Washington & Wells | ![]() | ▼1 ▲2 | 8.9 | |
| Quincy | ![]() | ▼1 ▲2 | 9.3 | |
| LaSalle & Van Buren | ![]() | ▼2 ▲1 | 9.6 | |
| Harold Washington Library & Jackson | ![]() | ▼2 ▲1 | 9.8 | |
| Melrose North | ![]() | ▼5 ▲6 | 10.6 | |
| North Park | ![]() | ▼4 ▲3 | 12.0 | |
| Melrose South | ![]() | ▼A ▲B | 12.4 | |
| Baron's Bar | ![]() | ▼A ▲B | 13.3 | |
| Olympia | ![]() | ▼C ▲B | 14.4 | |
| Greenfield Union Terminal | ![]() | ▼C ▲B | 15.3 | |
| Dawson | ![]() | ▼A ▲D | 16.8 | |
| Dawson Northeast | ![]() | ▼2 ▲1 | 18.2 | |
| South Rio Pueblo | ![]() | ▼B ▲A | 19.4 | |
| Lannex | ![]() | ▼D ▲C | 20.8 | |
| Mattupolis Pacific Central | ![]() | ▼B ▲A | 25.3 | |
| Bellinghampton | ▼2 ▲1 | 25.8 | ||
| Montebello | ▼2 ▲1 | 26.1 | ||
| Hastings Junction | ![]() | ▼B ▲A | 27.6 | |
| Hastings | ▼2 ▲1 | 28.3 | ||
| Hastings Riverside | ▼2 ▲1 | 28.9 | ||
| Hastings West | ▼2 ▲1 | 29.7 | ||
| Medford | ![]() | 1 | 31.2 |
History
The line was first planned as the GTA Teal Line (
), a commuter rail line of the Greenfield Transit Authority (GTA Commuter Rail) with 31 stations between 新 鶴川 (Shintsurukawa) and Medford.
Luton Village West has since been renamed Hedgebury-Luton Village West; Luton Village East has since been renamed Dunham Mile-Luton Village East; Oxstead South has since been renamed Oxstead; Harold Washington Library has since been renamed Harold Washington Library & Jackson.
Operations
- Hastings Junction – Medford corridor: runs local, serving all stops; shares the corridor with
M1 line (express) (see Express and local sections). - Shared track with
Sapphire line between Washington & Wells and Harold Washington Library (see Interlined lines).
Rolling stock
The line's trains are modelled on the MNR M9A (see Transitica rolling stock).

History
Metro-North chose in 2018 not to take up its options on the LIRR's Kawasaki M9 order, and overhauled its M3A cars instead while it worked with the LIRR on a new order. In June 2025 the MTA approved about $2.3 billion for 316 M9A cars, 156 for Metro-North and 160 for the LIRR, and the contract went to Alstom on 23 June 2025. They are being built at Hornell and Plattsburgh, New York, and will replace Metro-North's remaining M3As on the Hudson and Harlem lines.
Design and features
Like the M9, the cars run as married pairs. Compared with the M7 they have wider seats, closed-loop armrests like the M8's, power outlets at every row and four to six extra seats per pair. Each car has four 32-inch screens, destination signs that show which car you are in ("Car 1 of 8"), outside speakers, CCTV and positive train control. Flip-up seats are damped so they don't slam. The M9A adds USB ports at every outlet, powered toilet doors, stainless-steel urinals and Gorilla Glass side windows, and uses an Alstom MITRAC IGBT drive in place of the M9's Mitsubishi equipment.
Specifications
| Real-world train | In Transitica | |
|---|---|---|
| Manufacturer | Alstom (Hornell and Plattsburgh, New York) | |
| Built | 2025–present | |
| Status | on order | |
| Number ordered | 316 cars (156 for Metro-North) | |
| Formation | married pairs | |
| Cars per train | 3 | |
| Operator | Metro-North Railroad, Long Island Rail Road | |
| Traction | Alstom MITRAC IGBT–VVVF | |
| Car length | 25.9 m (85 ft) | 25.9 m (85 ft) |
| Width | 3.25 m (10 ft 8 in) | |
| Height | 3.95 m (12 ft 11.6 in) | |
| Maximum speed | 129 km/h (80 mph) in service; 161 km/h (100 mph) design | 129 km/h (100 mph) |
| Capacity | 101–111 seated per car | |
| Electric system | 750 V DC third rail | third rail, 750 V DC |
| Signalling | ATC, pulse-code cab signalling, PTC | |
| Platform length | 80 m (262.5 ft) | |
| Acceleration | 1.1 m/(h*s) (2 mph/s) | |
| Deceleration | 1.3 m/(h*s) (3 mph/s) |
In Transitica
The Teal line is waiting for the M9A. Like Metro-North, the GTA turned down its M9 options in 2018 and kept its older cars running, then joined the joint Metro-North and LIRR order that went to Alstom in June 2025. The line's trains follow the M9A design, with USB ports at every seat and Gorilla Glass windows, built at Hornell and Plattsburgh.
Source: M9 (railcar) on Wikipedia.



















