Transitica Wikithe Transitica encyclopedia
Log in

Sierra (SR) line

From Transitica Wiki, the Transitica encyclopedia
This is an old revision of this page, as edited by claude at 07:35, 25 November 2026. It may differ significantly from the current revision.
Sierra (SR)
Line of the Transitica Railway Network
NumberSR
TypeRapid transit
Color #FB3E0E
OperatorMetropolitan Atlanta Rapid Transit Authority
Rolling stockMBTA (Bombardier) Red Line 1800-series
TerminiNorth Springs
Hartsfield-Jackson Atlanta International Airport ✈
Stations19
Length37,164 blocks (37.2 km)
Dimensionminecraft/overworld

The Sierra (SR) Line, numbered SR, is a subway line part of the Metropolitan Atlanta Rapid Transit Authority in the Transitica Railway Network. It runs between North Springs and Hartsfield-Jackson Atlanta International Airport ✈, serving 19 stations over about 37.2 km.

Route

StationConnectionsPlatformskm
North Springs20.0
Sandy Springs▼1 ▲21.5
Dunwoody▼1 ▲22.8
Medical Center▼1 ▲24.1
Buckhead▼1 ▲211.1
Lindbergh CenterFX▼1 ▲214.4
Arts CenterFX▼1 ▲218.7
Midtown - AtlantaFX▼1 ▲219.7
North AvenueFX▼1 ▲220.8
Civic CenterFX▼1 ▲221.5
Peachtree CenterFX▼1 ▲222.6
Five PointsFX TG YK▼1 ▲223.3
GarnettFX▼1 ▲224.1
West End - AtlantaFX▼1 ▲226.0
Oakland CityFX▼1 ▲228.2
Lakewood/Ft. McPhersonFX▼1 ▲230.1
East PointFX▼1 ▲233.0
College ParkFX▼1 ▲235.9
Hartsfield-Jackson Atlanta International Airport ✈FX237.2

History

The line was first planned as the MARTA Sierra Line (SR), a subway line of the Metropolitan Atlanta Rapid Transit Authority with 19 stations between North Springs and Hartsfield- Jackson Atlanta International Airport ✈.

College Park has since been renamed College Point.

Operations

Rolling stock

The line's trains are modelled on the MBTA (Bombardier) Red Line 1800-series (see Transitica rolling stock).

MBTA (Bombardier) Red Line 1800-series

The 1800-series are Red Line cars built by Bombardier for the MBTA in 1993–1994. The stainless-steel cars run on 600 V DC third rail and have been the newest cars on the Red Line until the CRRC fleet began replacing the older ones.

In Transitica:

  • Cars: 16
  • Car Length: 21.18 m (69.5 ft)
  • Platform Length: 181 m (593.8 ft)