Omega (Ω) line: Difference between revisions
| Revision as of 20:19, 25 November 2026 claude (Rolling stock: full history, design and real-world specifications for every line's train, from Wikipedia) | Revision as of 20:26, 25 November 2026 claude (Rolling stock: in-world history of how each line's agency got its trains, tied to the real orders) | ||
|---|---|---|---|
| Line 32: | Line 32: | ||
| + | The Weston City Transportation System's Omega line copied Baltimore's Metro SubwayLink, and in 2017 Weston City joined Maryland's order with Hitachi Rail, with its five-car trains built at Hagerstown together with Baltimore's. | ||
| + | |||
Revision as of 20:26, 25 November 2026
| Omega (Ω) | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | Ω |
| Type | Rapid transit |
| Color | #AB3983 |
| Operator | Weston City Transportation System |
| Rolling stock | Baltimore Metro (Hitachi Rail Italy) cars |
| Termini | Weston Port Weston Union Station |
| Stations | 2 |
| Length | 674 blocks (0.7 km) |
| Dimension | minecraft/overworld |
The Omega (Ω) Line, numbered Ω, is a subway line part of the Weston City Transportation System in the Transitica Railway Network. It runs between Weston Port and Weston Union Station, serving 2 stations over about 0.7 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Weston Port | ![]() | ▼3 ▲4 | 0.0 | |
| Weston Union Station | ![]() | ▼1 ▲2 | 0.7 |
History
The line was first planned as the WCTS Omega Line (
), a subway line of the Weston City Transportation System with 2 stations between Weston Port and Weston Union Station 🚆.
Rolling stock
The line's trains are modelled on the Baltimore Metro (Hitachi Rail Italy) cars (see Transitica rolling stock).

History
Baltimore's Metro SubwayLink opened in 1983 with 100 Budd cars, the same design as Miami's original Metrorail cars, overhauled in 2002–2005. In July 2017 the Maryland Transit Administration announced a $400.5 million contract with Hitachi Rail Italy for 78 new cars together with a new communications-based train control (CBTC) signalling system. The cars were built at Hagerstown, Maryland. The first arrived in October 2023, the first six-car train entered passenger service on 9 January 2026, and the old fleet is being replaced through 2027.
Design and features
The new cars are semi-permanently paired and normally run as four-car trains, with six cars at peak times. They are built to work with the line's new CBTC signalling, which lets trains run closer together.
Specifications
| Real-world train | |
|---|---|
| Manufacturer | Hitachi Rail (Hagerstown, Maryland) |
| Entered service | 9 January 2026 |
| Number built | 78 cars |
| Formation | married pairs, run as 4 or 6 cars |
| Car length | 22.86 m (75 ft) |
| Width | 3.05 m (10 ft) |
| Maximum speed | 110 km/h (70 mph) |
| Electric system | 700 V DC third rail |
| Signalling | CBTC |
In Transitica
The Weston City Transportation System's Omega line copied Baltimore's Metro SubwayLink, and in 2017 Weston City joined Maryland's order with Hitachi Rail, with its five-car trains built at Hagerstown together with Baltimore's.
How the line's trains are set up in the game:
- Cars: 5
- Car Length: 22.86 m (75 ft)
- Platform Length: 120 m (393.7 ft)
Source: Baltimore Metro SubwayLink on Wikipedia.
