Transitica Wikithe Transitica encyclopedia
Log in

Nitrogen (NI) line

From Transitica Wiki, the Transitica encyclopedia
This is an old revision of this page, as edited by claude at 20:19, 25 November 2026. It may differ significantly from the current revision.
Nitrogen (NI)
Line of the Transitica Railway Network
NumberNI
TypeRapid transit
Color #25FFD0
OperatorXIXth Century City Transit
Division19CT Deep Tube Lines (subway)
Rolling stockLondon Underground (Alstom/Metro-Cammell) 1996 Stock
TerminiAnhalter Bahnhof
Senat de Russie
Stations18
Length6,862 blocks (6.9 km)
Dimensionminecraft/overworld

The Nitrogen (NI) Line, numbered NI, is a subway line part of XIXth Century City Transit in the Transitica Railway Network. It runs between Anhalter Bahnhof and Senat de Russie, serving 18 stations over about 6.9 km.

Route

StationConnectionsPlatformskm
Anhalter BahnhofAL MG20.0
Bülowstraße▼2 ▲10.5
Place de l'OpéraOX▼2 ▲11.8
Rue VendomeOX▼2 ▲12.2
Palais de l'ÉlyséeOX▼2 ▲12.4
Boulevard KensingtonOX▼2 ▲12.8
Rue de l'Homme TourretteOX▼4 ▲33.0
Parc MontmartreOX▼2 ▲13.4
Sé do PortoOX▼2 ▲13.8
Cours Streets - AndreOX▼2 ▲14.1
Eglise Street - NizierOX▼2 ▲14.4
Vieux LyonOX▼4 ▲24.7
Tour EiffelCB OX▼1 ▲25.0
Crystal PalaceOX▼1 ▲25.3
Place de la mairieOX▼1 ▲25.8
Place Dessous▼1 ▲26.1
Wiener Platz▼1 ▲26.4
Senat de Russie▼1 ▲26.9

History

The line was first planned as the 19CT Nitrogen Line (NI), a subway line of the XIXth Century City Transit (19CT Deep Tube Lines (subway)) with 18 stations between Senat de Russie and Anhalter Bahnhof 🚆.

Eglise Street - Nizier has since been renamed Eglise Stret - Nizier; Parc Montmartre has since been renamed Pare Montmartre; Anhalter Bahnhof has since been renamed Anhalter Bahnof.

Operations

Rolling stock

The line's trains are modelled on the London Underground (Alstom/Metro-Cammell) 1996 Stock (see Transitica rolling stock).

London Underground (Alstom/Metro-Cammell) 1996 Stock

History

The 1996 Stock runs on London Underground's Jubilee line. It was built by GEC Alsthom-Metro-Cammell (now Alstom) between 1995 and 1998, with the first six trains made in Barcelona and the rest assembled at Washwood Heath in Birmingham. It replaced the 1983 Stock, which was judged too expensive to refurbish, and entered service on 24 December 1997, ready for the Jubilee Line Extension to Stratford.

The trains were built with six cars. In 2005, when the line was upgraded, 59 extra cars were added to make them seven-car trains, along with four brand-new seven-car trains, so the fleet is now 63 trains. The line was resignalled with Thales SelTrac in 2009, and since 2011 the trains have run automatically with the driver supervising. They were refurbished between 2017 and 2019.

Design and features

The 1996 Stock looks much like the Northern line's 1995 Stock, but it is a different design underneath: it uses GTO-thyristor drives with AC motors (the 1995 Stock has newer IGBT drives) and Alstom bogies with rubber suspension. Each train seats 234 and carries about 875 in all.

Specifications

Real-world train
ManufacturerGEC Alsthom-Metro-Cammell (Washwood Heath, Birmingham; Barcelona)
Built1995–1998; extra cars 2005
Entered service24 December 1997
Number built63 seven-car trains (441 cars)
Formation7 cars
Capacity875 per train (234 seated)
TractionGEC Alsthom GTO–VVVF, AC motors
SignallingThales SelTrac (automatic train operation)
Car length18.02 m (59 ft 1 in); end cars 18.2 m
Width2.63 m (8 ft 7.5 in)
Maximum speed100 km/h (62 mph)
Electric system630 V DC fourth rail

In Transitica

How the line's trains are set up in the game:

  • Cars: 2
  • Car Length: 17.77 m (58.3 ft)
  • Platform Length: 40 m (131.2 ft)

Source: London Underground 1996 Stock on Wikipedia.