Transitica Wikithe Transitica encyclopedia
Log in

M4 line: Difference between revisions

Revision as of 22:57, 24 November 2026
claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages)
Revision as of 20:55, 25 November 2026
claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica))
Line 4:Line 4:
−
Ideal rolling stock: "Vancouver Skytrain (Bombardier) Innovia Metro Mark III"
+
Rolling stock: "Vancouver Skytrain (Bombardier) Innovia Metro Mark III"
---
---
{{route}}
{{route}}
Line 8:Line 8:
## History
## History
 
 
−
In the [[Transitica route profiles]], an older planning document, this line was the '''MTM Mattupolis 4 Line''' (<img class="chip-img" src="/images/bullet-m4.png" alt="M4" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 6 stations between Mattupolis Pacific Central and Granby.
+
The line was first planned as the '''MTM Mattupolis 4 Line''' (<img class="chip-img" src="/images/bullet-m4.png" alt="M4" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 6 stations between Mattupolis Pacific Central and Granby.
 
 
−
## Route profile
+
## Rolling stock
 
 
−
The route profile still matches the line today: the same 6 stations, between the same termini.
+
The line's trains are modelled on the '''Vancouver Skytrain (Bombardier) Innovia Metro Mark III''' (see [[Transitica rolling stock]]).
 
 
−
## Ideal rolling stock
+
![Vancouver Skytrain (Bombardier) Innovia Metro Mark III](/images/Transitica_Vancouver_Skytrain_Bombardier_Innovia_Metro_Mark_III.jpg)
 
 
−
The route profile chose this real-world train for the line (see [[Transitica rolling stock]]):
+
### History
 
 
−
### Vancouver Skytrain (Bombardier) Innovia Metro Mark III
+
The Mark III (Bombardier's Innovia Metro 300) is the third generation of SkyTrain cars, and Vancouver was the first customer for the design. Deliveries began in 2015 and the first trains entered service in August 2016, for the Evergreen Extension of the Millennium Line. TransLink ordered 28 cars at first and 28 more each in December 2016 and February 2018, for 84 in all.
 
 
−
![Vancouver Skytrain (Bombardier) Innovia Metro Mark III](/images/Transitica_Vancouver_Skytrain_Bombardier_Innovia_Metro_Mark_III.jpg)
+
### Design and features
 
 
−
- Cars: 2
+
The Mark III is a four-car articulated train that riders can walk through from end to end. Compared with the Mark II it has a redesigned interior with more room, larger windows and a restyled front. Like the other Expo and Millennium line trains it is driverless and uses linear induction motors.
−
- Car Length: 17.025 m (55.9 ft)
−
- Platform Length: 40 m (131.2 ft)
 
 
+
### Specifications
+
 
+
<table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Bombardier</td><td></td></tr><tr><th>Delivered</th><td>from 2015</td><td></td></tr><tr><th>Entered service</th><td>August 2016</td><td></td></tr><tr><th>Number built</th><td>84 cars</td><td></td></tr><tr><th>Formation</th><td>4 cars, articulated</td><td></td></tr><tr><th>Cars per train</th><td></td><td>2</td></tr><tr><th>Traction</th><td>linear induction motors</td><td></td></tr><tr><th>Electric system</th><td>650 V DC power rail</td><td></td></tr><tr><th>Operation</th><td>driverless (automated)</td><td></td></tr><tr><th>Maximum speed</th><td>80 km/h (50 mph)</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Car length</th><td></td><td>17.025 m (55.9 ft)</td></tr><tr><th>Platform length</th><td></td><td>40 m (131.2 ft)</td></tr></table>
+
 
+
### In Transitica
+
 
+
Mattupolis Metro ordered Bombardier Mark III trains for the M4 line in 2016, right after TransLink, as the line was extended.
+
 
+
<p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)" rel="noopener">SkyTrain (Vancouver)</a> on Wikipedia.</p>

Revision as of 20:55, 25 November 2026

M4
Line of the Transitica Railway Network
NumberM4
TypeRapid transit
Color #8833DE
OperatorMattupolis Metro
Rolling stockVancouver Skytrain (Bombardier) Innovia Metro Mark III
TerminiGranby
Mattupolis Pacific Central
Stations6
Length4,004 blocks (4.0 km)
Dimensionminecraft/overworld

The M4 Line, numbered M4, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between Granby and Mattupolis Pacific Central, serving 6 stations over about 4.0 km.

Route

StationConnectionsPlatformskm
Granby10.0
Clear Falls11.8
Burnaby12.7
South MattupolisM3 M2 LM23.3
Downtown MattupolisM2 LM53.7
Mattupolis Pacific CentralM1 M3 M2 TL LM54.0

History

The line was first planned as the MTM Mattupolis 4 Line (M4), a subway line of the Mattupolis Metro with 6 stations between Mattupolis Pacific Central and Granby.

Rolling stock

The line's trains are modelled on the Vancouver Skytrain (Bombardier) Innovia Metro Mark III (see Transitica rolling stock).

Vancouver Skytrain (Bombardier) Innovia Metro Mark III

History

The Mark III (Bombardier's Innovia Metro 300) is the third generation of SkyTrain cars, and Vancouver was the first customer for the design. Deliveries began in 2015 and the first trains entered service in August 2016, for the Evergreen Extension of the Millennium Line. TransLink ordered 28 cars at first and 28 more each in December 2016 and February 2018, for 84 in all.

Design and features

The Mark III is a four-car articulated train that riders can walk through from end to end. Compared with the Mark II it has a redesigned interior with more room, larger windows and a restyled front. Like the other Expo and Millennium line trains it is driverless and uses linear induction motors.

Specifications

Real-world trainIn Transitica
ManufacturerBombardier
Deliveredfrom 2015
Entered serviceAugust 2016
Number built84 cars
Formation4 cars, articulated
Cars per train2
Tractionlinear induction motors
Electric system650 V DC power rail
Operationdriverless (automated)
Maximum speed80 km/h (50 mph)
Track gauge1,435 mm (4 ft 8½ in)
Car length17.025 m (55.9 ft)
Platform length40 m (131.2 ft)

In Transitica

Mattupolis Metro ordered Bombardier Mark III trains for the M4 line in 2016, right after TransLink, as the line was extended.

Source: SkyTrain (Vancouver) on Wikipedia.