M3 line
| M3 | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | M3 |
| Type | Rapid transit |
| Color | #800100 |
| Operator | Mattupolis Metro |
| Rolling stock | Vancouver Skytrain (Bombardier) ART Mark II (2nd generation) |
| Termini | Northwest Mattupolis Pacific Heights |
| Stations | 9 |
| Length | 3,843 blocks (3.8 km) |
| Dimension | minecraft/overworld |
The M3 Line, numbered M3, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between Northwest Mattupolis and Pacific Heights, serving 9 stations over about 3.8 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Northwest Mattupolis | 1 | 0.0 | ||
| Windermere | ▼2 ▲1 | 0.6 | ||
| Mountain Way | ▼2 ▲1 | 1.4 | ||
| North Mattupolis | ![]() | ▼1 ▲2 | 1.8 | |
| Harbourville Park | ![]() | ▼1 ▲2 | 2.4 | |
| Mattupolis Pacific Central | ![]() | ▼4 ▲3 | 2.9 | |
| Midtown - Mattupolis | ▼1 ▲2 | 3.3 | ||
| South Mattupolis | ![]() | ▼4 ▲5 | 3.5 | |
| Pacific Heights | 1 | 3.8 |
History
The line was first planned as the MTM Mattupolis 3 Line (
), a subway line of the Mattupolis Metro with 9 stations between Northwest Mattupolis and Pacific Heights.
Operations
- Shared track with
M1 line between Mattupolis Pacific Central and North Mattupolis (see Interlined lines).
Rolling stock
The line's trains are modelled on the Vancouver Skytrain (Bombardier) ART Mark II (2nd generation) (see Transitica rolling stock).

History
The Mark II (Bombardier's ART 200) was the second generation of SkyTrain cars, ordered for the opening of the Millennium Line in 2002, with 48 more cars ordered in 2009 to add capacity before the Canada Line and the 2010 Winter Olympics. They run on both the Expo and Millennium lines.
Design and features
Mark II cars come as permanently coupled, articulated pairs about 33.4 m long, so passengers can walk between the two cars. They run as four-car trains on the Expo Line and two-car trains on the Millennium Line, without drivers, using linear induction motors.
Specifications
| Real-world train | |
|---|---|
| Manufacturer | Bombardier |
| Built | 2000–2002, 2009–2010 |
| Entered service | 2002 |
| Formation | articulated married pairs, run as 2 or 4 cars |
| Car length | about 16.7 m (54 ft 9 in); pair 33.4 m |
| Traction | linear induction motors |
| Electric system | 650 V DC power rail |
| Operation | driverless (automated) |
| Maximum speed | 80 km/h (50 mph) |
| Track gauge | 1,435 mm (4 ft 8½ in) |
In Transitica
The M3 line's Bombardier Mark II trains were ordered when Vancouver's Millennium Line opened in 2002, and run as two-car trains.
How the line's trains are set up in the game:
- Cars: 2
- Car Length: 17.35 m (56.9 ft)
- Platform Length: 40 m (131.2 ft)
Source: Bombardier Advanced Rapid Transit on Wikipedia.



