M3 line: Difference between revisions
| Revision as of 22:57, 24 November 2026 claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages) | Revision as of 20:55, 25 November 2026 claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica)) | ||
|---|---|---|---|
| Line 4: | Line 4: | ||
| − | Ideal rolling stock: "Vancouver Skytrain (Bombardier) ART Mark II (2nd generation)" | + | Rolling stock: "Vancouver Skytrain (Bombardier) ART Mark II (2nd generation)" |
--- | --- | ||
{{route}} | {{route}} | ||
| Line 8: | Line 8: | ||
## History | ## History | ||
| − | In the [[Transitica route profiles]], an older planning document, this line was the '''MTM Mattupolis 3 Line''' (<img class="chip-img" src="/images/bullet-m3.png" alt="M3" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 9 stations between Northwest Mattupolis and Pacific Heights. | + | The line was first planned as the '''MTM Mattupolis 3 Line''' (<img class="chip-img" src="/images/bullet-m3.png" alt="M3" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 9 stations between Northwest Mattupolis and Pacific Heights. |
| − | ## Route profile | + | ## Operations |
| − | The route profile still matches the line today: the same 9 stations, between the same termini. | + | - '''Shared track''' with <a href="/wiki/M1_line" class="chip-link" title="M1 line"><img class="chip-img" src="/images/bullet-m1.png" alt="M1" loading="lazy"></a> [[M1 line]] between Mattupolis Pacific Central and North Mattupolis (see [[Interlined lines]]). |
| − | ### Operations in the route profile | + | ## Rolling stock |
| − | - '''Shared track''' with <a href="/wiki/M1_line" class="chip-link" title="M1 line"><img class="chip-img" src="/images/bullet-m1.png" alt="M1" loading="lazy"></a> [[M1 line]] between Mattupolis Pacific Central and North Mattupolis (see [[Interlined lines]]). | + | The line's trains are modelled on the '''Vancouver Skytrain (Bombardier) ART Mark II (2nd generation)''' (see [[Transitica rolling stock]]). |
| − | ## Ideal rolling stock | + |  |
| − | The route profile chose this real-world train for the line (see [[Transitica rolling stock]]): | + | ### History |
| − | ### Vancouver Skytrain (Bombardier) ART Mark II (2nd generation) | + | The Mark II (Bombardier's ART 200) was the second generation of SkyTrain cars, ordered for the opening of the Millennium Line in 2002, with 48 more cars ordered in 2009 to add capacity before the Canada Line and the 2010 Winter Olympics. They run on both the Expo and Millennium lines. |
| − |  | + | ### Design and features |
| − | - Cars: 2 | + | Mark II cars come as permanently coupled, articulated pairs about 33.4 m long, so passengers can walk between the two cars. They run as four-car trains on the Expo Line and two-car trains on the Millennium Line, without drivers, using linear induction motors. |
| − | - Car Length: 17.35 m (56.9 ft) | ||
| − | - Platform Length: 40 m (131.2 ft) | ||
| + | ### Specifications | ||
| + | |||
| + | <table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Bombardier</td><td></td></tr><tr><th>Built</th><td>2000–2002, 2009–2010</td><td></td></tr><tr><th>Entered service</th><td>2002</td><td></td></tr><tr><th>Formation</th><td>articulated married pairs, run as 2 or 4 cars</td><td></td></tr><tr><th>Cars per train</th><td></td><td>2</td></tr><tr><th>Car length</th><td>about 16.7 m (54 ft 9 in); pair 33.4 m</td><td>17.35 m (56.9 ft)</td></tr><tr><th>Traction</th><td>linear induction motors</td><td></td></tr><tr><th>Electric system</th><td>650 V DC power rail</td><td></td></tr><tr><th>Operation</th><td>driverless (automated)</td><td></td></tr><tr><th>Maximum speed</th><td>80 km/h (50 mph)</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Platform length</th><td></td><td>40 m (131.2 ft)</td></tr></table> | ||
| + | |||
| + | ### In Transitica | ||
| + | |||
| + | The M3 line's Bombardier Mark II trains were ordered when Vancouver's Millennium Line opened in 2002, and run as two-car trains. | ||
| + | |||
| + | <p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/Bombardier_Advanced_Rapid_Transit" rel="noopener">Bombardier Advanced Rapid Transit</a> on Wikipedia.</p> | ||
Revision as of 20:55, 25 November 2026
| M3 | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | M3 |
| Type | Rapid transit |
| Color | #800100 |
| Operator | Mattupolis Metro |
| Rolling stock | Vancouver Skytrain (Bombardier) ART Mark II (2nd generation) |
| Termini | Northwest Mattupolis Pacific Heights |
| Stations | 9 |
| Length | 3,843 blocks (3.8 km) |
| Dimension | minecraft/overworld |
The M3 Line, numbered M3, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between Northwest Mattupolis and Pacific Heights, serving 9 stations over about 3.8 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Northwest Mattupolis | 1 | 0.0 | ||
| Windermere | ▼2 ▲1 | 0.6 | ||
| Mountain Way | ▼2 ▲1 | 1.4 | ||
| North Mattupolis | ![]() | ▼1 ▲2 | 1.8 | |
| Harbourville Park | ![]() | ▼1 ▲2 | 2.4 | |
| Mattupolis Pacific Central | ![]() | ▼4 ▲3 | 2.9 | |
| Midtown - Mattupolis | ▼1 ▲2 | 3.3 | ||
| South Mattupolis | ![]() | ▼4 ▲5 | 3.5 | |
| Pacific Heights | 1 | 3.8 |
History
The line was first planned as the MTM Mattupolis 3 Line (
), a subway line of the Mattupolis Metro with 9 stations between Northwest Mattupolis and Pacific Heights.
Operations
- Shared track with
M1 line between Mattupolis Pacific Central and North Mattupolis (see Interlined lines).
Rolling stock
The line's trains are modelled on the Vancouver Skytrain (Bombardier) ART Mark II (2nd generation) (see Transitica rolling stock).

History
The Mark II (Bombardier's ART 200) was the second generation of SkyTrain cars, ordered for the opening of the Millennium Line in 2002, with 48 more cars ordered in 2009 to add capacity before the Canada Line and the 2010 Winter Olympics. They run on both the Expo and Millennium lines.
Design and features
Mark II cars come as permanently coupled, articulated pairs about 33.4 m long, so passengers can walk between the two cars. They run as four-car trains on the Expo Line and two-car trains on the Millennium Line, without drivers, using linear induction motors.
Specifications
| Real-world train | In Transitica | |
|---|---|---|
| Manufacturer | Bombardier | |
| Built | 2000–2002, 2009–2010 | |
| Entered service | 2002 | |
| Formation | articulated married pairs, run as 2 or 4 cars | |
| Cars per train | 2 | |
| Car length | about 16.7 m (54 ft 9 in); pair 33.4 m | 17.35 m (56.9 ft) |
| Traction | linear induction motors | |
| Electric system | 650 V DC power rail | |
| Operation | driverless (automated) | |
| Maximum speed | 80 km/h (50 mph) | |
| Track gauge | 1,435 mm (4 ft 8½ in) | |
| Platform length | 40 m (131.2 ft) |
In Transitica
The M3 line's Bombardier Mark II trains were ordered when Vancouver's Millennium Line opened in 2002, and run as two-car trains.
Source: Bombardier Advanced Rapid Transit on Wikipedia.



