M2 line
| M2 | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | M2 |
| Type | Rapid transit |
| Color | #F5C729 |
| Operator | Mattupolis Metro |
| Rolling stock | Vancouver Skytrain (Hyundai Rotem) EMU |
| Termini | South Mattupolis West End - Mattupolis |
| Stations | 10 |
| Length | 3,620 blocks (3.6 km) |
| Dimension | minecraft/overworld |
The M2 Line, numbered M2, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between South Mattupolis and West End - Mattupolis, serving 10 stations over about 3.6 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| South Mattupolis | ![]() | ▼6 ▲7 | 0.0 | |
| Commercial - Highland | ▼2 ▲1 | 0.4 | ||
| Holden | ▼2 ▲1 | 0.7 | ||
| Willingdon | ▼2 ▲1 | 1.0 | ||
| Southampton | ![]() | ▼3 ▲4 | 1.5 | |
| Mattupolis Pacific Central | ![]() | ▼6 ▲7 | 2.5 | |
| Downtown Mattupolis | ![]() | ▼1 ▲2 | 2.9 | |
| Mattupolis University | ▼1 ▲2 | 3.1 | ||
| Marine Village | ▼2 ▲1 | 3.3 | ||
| West End - Mattupolis | 1 | 3.6 |
History
The line was first planned as the MTM Mattupolis 2 Line (
), a subway line of the Mattupolis Metro with 10 stations between West End and South Mattupolis.
Commercial - Highland has since been renamed Commerical - Highland; Southampton has since been renamed Southhampton.
Rolling stock
The line's trains are modelled on the Vancouver Skytrain (Hyundai Rotem) EMU (see Transitica rolling stock).

History
The Canada Line, from downtown Vancouver to Richmond and the airport, opened on 17 August 2009, in time for the 2010 Winter Olympics, with 20 two-car trains built by Hyundai Rotem in South Korea. It was built and is run under a public–private partnership, separately from the Expo and Millennium lines. Twelve more trains (24 cars) were ordered in 2018 to cope with growing ridership, for 32 in all.
Design and features
Unlike the rest of SkyTrain, the Canada Line trains use ordinary rotary electric motors rather than linear induction motors, so they cannot run on the other lines. They are two-car articulated units, driverless like the rest of the network, and take power from a 750 V DC third rail.
Specifications
| Real-world train | |
|---|---|
| Manufacturer | Hyundai Rotem |
| Entered service | 17 August 2009 |
| Number built | 32 two-car trains |
| Formation | 2 cars, articulated |
| Traction | rotary AC motors |
| Electric system | 750 V DC third rail |
| Operation | driverless (automated) |
| Maximum speed | 80 km/h (50 mph) |
| Track gauge | 1,435 mm (4 ft 8½ in) |
In Transitica
How the line's trains are set up in the game:
- Cars: 2
- Car Length: 20.5 m (67.3 ft)
- Platform Length: 40 m (131.2 ft)
Source: SkyTrain (Vancouver) on Wikipedia.




