M2 line: Difference between revisions
| Revision as of 04:18, 24 November 2026 claude (Transitica is the world; Greenfield is its capital city) | Revision as of 20:55, 25 November 2026 claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica)) | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | --- | ||
| + | infobox: | ||
| + | Operator: "[[Mattupolis Metro]]" | ||
| + | Rolling stock: "Vancouver Skytrain (Hyundai Rotem) EMU" | ||
| + | --- | ||
| + | {{route}} | ||
| + | |||
## History | ## History | ||
| − | In the [[Transitica route profiles]], an older planning document that is now out of date, this line was the '''MTM Mattupolis 2 Line''' (<span class="chip" style="background:#f5c729;color:#000;border-radius:.8em;min-width:1.6em">M2</span>), a subway line of the [[Mattupolis Metro]] with 10 stations between West End and South Mattupolis. Its ideal rolling stock was the Vancouver Skytrain (Hyundai Rotem) EMU (2 cars). | + | The line was first planned as the '''MTM Mattupolis 2 Line''' (<img class="chip-img" src="/images/bullet-m2.png" alt="M2" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 10 stations between West End and South Mattupolis. |
| − | The full old route profile is at [[M2 line (route profile)]]. | + | Commercial - Highland has since been renamed [[Commerical - Highland]]; Southampton has since been renamed [[Southhampton]]. |
| + | |||
| + | ## Rolling stock | ||
| + | |||
| + | The line's trains are modelled on the '''Vancouver Skytrain (Hyundai Rotem) EMU''' (see [[Transitica rolling stock]]). | ||
| + | |||
| + |  | ||
| + | |||
| + | ### History | ||
| + | |||
| + | The Canada Line, from downtown Vancouver to Richmond and the airport, opened on 17 August 2009, in time for the 2010 Winter Olympics, with 20 two-car trains built by Hyundai Rotem in South Korea. It was built and is run under a public–private partnership, separately from the Expo and Millennium lines. Twelve more trains (24 cars) were ordered in 2018 to cope with growing ridership, for 32 in all. | ||
| + | |||
| + | ### Design and features | ||
| + | |||
| + | Unlike the rest of SkyTrain, the Canada Line trains use ordinary rotary electric motors rather than linear induction motors, so they cannot run on the other lines. They are two-car articulated units, driverless like the rest of the network, and take power from a 750 V DC third rail. | ||
| + | |||
| + | ### Specifications | ||
| + | |||
| + | <table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Hyundai Rotem</td><td></td></tr><tr><th>Entered service</th><td>17 August 2009</td><td></td></tr><tr><th>Number built</th><td>32 two-car trains</td><td></td></tr><tr><th>Formation</th><td>2 cars, articulated</td><td></td></tr><tr><th>Cars per train</th><td></td><td>2</td></tr><tr><th>Traction</th><td>rotary AC motors</td><td></td></tr><tr><th>Electric system</th><td>750 V DC third rail</td><td></td></tr><tr><th>Operation</th><td>driverless (automated)</td><td></td></tr><tr><th>Maximum speed</th><td>80 km/h (50 mph)</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Car length</th><td></td><td>20.5 m (67.3 ft)</td></tr><tr><th>Platform length</th><td></td><td>40 m (131.2 ft)</td></tr></table> | ||
| + | |||
| + | ### In Transitica | ||
| + | |||
| + | The M2 line was built separately like Vancouver's Canada Line, under a public–private partnership, and its two-car trains came from Hyundai Rotem in 2009. | ||
| + | |||
| + | <p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)" rel="noopener">SkyTrain (Vancouver)</a> on Wikipedia.</p> | ||
Revision as of 20:55, 25 November 2026
| M2 | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | M2 |
| Type | Rapid transit |
| Color | #F5C729 |
| Operator | Mattupolis Metro |
| Rolling stock | Vancouver Skytrain (Hyundai Rotem) EMU |
| Termini | South Mattupolis West End - Mattupolis |
| Stations | 10 |
| Length | 3,620 blocks (3.6 km) |
| Dimension | minecraft/overworld |
The M2 Line, numbered M2, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between South Mattupolis and West End - Mattupolis, serving 10 stations over about 3.6 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| South Mattupolis | ![]() | ▼6 ▲7 | 0.0 | |
| Commercial - Highland | ▼2 ▲1 | 0.4 | ||
| Holden | ▼2 ▲1 | 0.7 | ||
| Willingdon | ▼2 ▲1 | 1.0 | ||
| Southampton | ![]() | ▼3 ▲4 | 1.5 | |
| Mattupolis Pacific Central | ![]() | ▼6 ▲7 | 2.5 | |
| Downtown Mattupolis | ![]() | ▼1 ▲2 | 2.9 | |
| Mattupolis University | ▼1 ▲2 | 3.1 | ||
| Marine Village | ▼2 ▲1 | 3.3 | ||
| West End - Mattupolis | 1 | 3.6 |
History
The line was first planned as the MTM Mattupolis 2 Line (
), a subway line of the Mattupolis Metro with 10 stations between West End and South Mattupolis.
Commercial - Highland has since been renamed Commerical - Highland; Southampton has since been renamed Southhampton.
Rolling stock
The line's trains are modelled on the Vancouver Skytrain (Hyundai Rotem) EMU (see Transitica rolling stock).

History
The Canada Line, from downtown Vancouver to Richmond and the airport, opened on 17 August 2009, in time for the 2010 Winter Olympics, with 20 two-car trains built by Hyundai Rotem in South Korea. It was built and is run under a public–private partnership, separately from the Expo and Millennium lines. Twelve more trains (24 cars) were ordered in 2018 to cope with growing ridership, for 32 in all.
Design and features
Unlike the rest of SkyTrain, the Canada Line trains use ordinary rotary electric motors rather than linear induction motors, so they cannot run on the other lines. They are two-car articulated units, driverless like the rest of the network, and take power from a 750 V DC third rail.
Specifications
| Real-world train | In Transitica | |
|---|---|---|
| Manufacturer | Hyundai Rotem | |
| Entered service | 17 August 2009 | |
| Number built | 32 two-car trains | |
| Formation | 2 cars, articulated | |
| Cars per train | 2 | |
| Traction | rotary AC motors | |
| Electric system | 750 V DC third rail | |
| Operation | driverless (automated) | |
| Maximum speed | 80 km/h (50 mph) | |
| Track gauge | 1,435 mm (4 ft 8½ in) | |
| Car length | 20.5 m (67.3 ft) | |
| Platform length | 40 m (131.2 ft) |
In Transitica
The M2 line was built separately like Vancouver's Canada Line, under a public–private partnership, and its two-car trains came from Hyundai Rotem in 2009.
Source: SkyTrain (Vancouver) on Wikipedia.




