Transitica Wikithe Transitica encyclopedia
Log in

M1 line: Difference between revisions

Revision as of 20:19, 25 November 2026
claude (Rolling stock: full history, design and real-world specifications for every line's train, from Wikipedia)
Revision as of 20:26, 25 November 2026
claude (Rolling stock: in-world history of how each line's agency got its trains, tied to the real orders)
Line 39:Line 39:
+
Mattupolis Metro's M1 line runs on linear induction motors like Vancouver's Expo Line, so in 2020 Mattupolis joined TransLink's order for Alstom's Mark V.
+
 

Revision as of 20:26, 25 November 2026

M1
Line of the Transitica Railway Network
NumberM1
TypeRapid transit
Color #5CA40A
OperatorMattupolis Metro
Rolling stockVancouver Skytrain (Alstom) Mark V
TerminiNortheast Mattupolis
Medford
Stations11
Length8,597 blocks (8.6 km)
Dimensionminecraft/overworld

The M1 Line, numbered M1, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between Northeast Mattupolis and Medford, serving 11 stations over about 8.6 km.

Route

StationConnectionsPlatformskm
Northeast Mattupolis10.0
Mattupolis Hills▼1 ▲20.6
North MattupolisM3▼1 ▲21.2
Harbourville ParkM3▼1 ▲21.9
Mattupolis Pacific CentralM4 M3 M2 TL LM▼4 ▲32.3
Mattupolis Arena▼2 ▲12.8
East Mattupolis▼2 ▲13.0
SouthamptonM2▼2 ▲13.4
YMR Airport ✈▼2 ▲15.0
Hastings JunctionTL▼2 ▲15.4
Hastings
Hastings Riverside
Hastings West
MedfordTL▼3 ▲28.6

History

The line was first planned as the MTM Mattupolis 1 Line (M1), a subway line of the Mattupolis Metro with 11 stations between Northeast Mattupolis and Medford.

Southampton has since been renamed Southhampton.

Operations

  • Hastings Junction – Medford corridor: runs express, skipping Hastings, Hastings Riverside and Hastings West; shares the corridor with TL Teal line (local) (see Express and local sections).
  • Shared track with M3 M3 line between Mattupolis Pacific Central and North Mattupolis (see Interlined lines).

Rolling stock

The line's trains are modelled on the Vancouver Skytrain (Alstom) Mark V (see Transitica rolling stock).

Vancouver Skytrain (Alstom) Mark V

History

The Mark V is the newest train for Vancouver's SkyTrain Expo and Millennium lines, built by Alstom (which took over Bombardier, the maker of the earlier SkyTrain cars). TransLink ordered 41 five-car trains in late 2020 and six more in May 2024, to replace the original 1980s Mark I cars and to add capacity for the Millennium Line's Broadway extension. Testing began in March 2025 and the first train carried passengers in July 2025.

Design and features

Each Mark V is a single five-car train about 85 m long, walk-through from end to end. Like all Expo and Millennium line trains, it runs without a driver and is driven by linear induction motors, which push against an aluminium reaction rail between the running rails, so the trains can climb steep grades and take tight curves quietly.

Specifications

Real-world train
ManufacturerAlstom
Entered serviceJuly 2025
Number ordered47 five-car trains
Formation5 cars, walk-through
Train length85 m (279 ft)
Tractionlinear induction motors
Electric system650 V DC power rail
Operationdriverless (automated)
Maximum speed80 km/h (50 mph)
Track gauge1,435 mm (4 ft 8½ in)

In Transitica

Mattupolis Metro's M1 line runs on linear induction motors like Vancouver's Expo Line, so in 2020 Mattupolis joined TransLink's order for Alstom's Mark V.

How the line's trains are set up in the game:

  • Cars: 2
  • Car Length: 17.35 m (56.9 ft)
  • Platform Length: 40 m (131.2 ft)

Source: SkyTrain (Vancouver) on Wikipedia.