M1 line: Difference between revisions
| Revision as of 22:57, 24 November 2026 claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages) | Revision as of 20:55, 25 November 2026 claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica)) | ||
|---|---|---|---|
| Line 4: | Line 4: | ||
| − | Yard (route profile): "Hastings" | + | Rolling stock: "Vancouver Skytrain (Alstom) Mark V" |
| − | Ideal rolling stock: "Vancouver Skytrain (Alstom) Mark V" | ||
--- | --- | ||
{{route}} | {{route}} | ||
| Line 9: | Line 8: | ||
## History | ## History | ||
| − | In the [[Transitica route profiles]], an older planning document, this line was the '''MTM Mattupolis 1 Line''' (<img class="chip-img" src="/images/bullet-m1.png" alt="M1" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 11 stations between Northeast Mattupolis and Medford. | + | The line was first planned as the '''MTM Mattupolis 1 Line''' (<img class="chip-img" src="/images/bullet-m1.png" alt="M1" loading="lazy">), a subway line of the [[Mattupolis Metro]] with 11 stations between Northeast Mattupolis and Medford. |
| − | |||
| − | ## Route profile | ||
| − | The route profile still matches the line today: the same 11 stations, between the same termini. Some stations have been renamed since: Southampton → [[Southhampton]]. | + | Southampton has since been renamed [[Southhampton]]. |
| − | ### Operations in the route profile | + | ## Operations |
| − | - '''Yard:''' Hastings (see [[Yards and depots]]). | ||
- '''Hastings Junction – Medford corridor:''' runs express, skipping Hastings, Hastings Riverside and Hastings West; shares the corridor with <a href="/wiki/Teal_line" class="chip-link" title="Teal line"><img class="chip-img" src="/images/bullet-teal.png" alt="TL" loading="lazy"></a> [[Teal line]] (local) (see [[Express and local sections]]). | - '''Hastings Junction – Medford corridor:''' runs express, skipping Hastings, Hastings Riverside and Hastings West; shares the corridor with <a href="/wiki/Teal_line" class="chip-link" title="Teal line"><img class="chip-img" src="/images/bullet-teal.png" alt="TL" loading="lazy"></a> [[Teal line]] (local) (see [[Express and local sections]]). | ||
- '''Shared track''' with <a href="/wiki/M3_line" class="chip-link" title="M3 line"><img class="chip-img" src="/images/bullet-m3.png" alt="M3" loading="lazy"></a> [[M3 line]] between Mattupolis Pacific Central and North Mattupolis (see [[Interlined lines]]). | - '''Shared track''' with <a href="/wiki/M3_line" class="chip-link" title="M3 line"><img class="chip-img" src="/images/bullet-m3.png" alt="M3" loading="lazy"></a> [[M3 line]] between Mattupolis Pacific Central and North Mattupolis (see [[Interlined lines]]). | ||
| − | ## Ideal rolling stock | + | ## Rolling stock |
| − | |||
| − | The route profile chose this real-world train for the line (see [[Transitica rolling stock]]): | ||
| − | ### Vancouver Skytrain (Alstom) Mark V | + | The line's trains are modelled on the '''Vancouver Skytrain (Alstom) Mark V''' (see [[Transitica rolling stock]]). |
 |  | ||
| − | - Cars: 2 | + | ### History |
| − | - Car Length: 17.35 m (56.9 ft) | ||
| − | - Platform Length: 40 m (131.2 ft) | ||
| + | The Mark V is the newest train for Vancouver's SkyTrain Expo and Millennium lines, built by Alstom (which took over Bombardier, the maker of the earlier SkyTrain cars). TransLink ordered 41 five-car trains in late 2020 and six more in May 2024, to replace the original 1980s Mark I cars and to add capacity for the Millennium Line's Broadway extension. Testing began in March 2025 and the first train carried passengers in July 2025. | ||
| + | |||
| + | ### Design and features | ||
| + | |||
| + | Each Mark V is a single five-car train about 85 m long, walk-through from end to end. Like all Expo and Millennium line trains, it runs without a driver and is driven by linear induction motors, which push against an aluminium reaction rail between the running rails, so the trains can climb steep grades and take tight curves quietly. | ||
| + | |||
| + | ### Specifications | ||
| + | |||
| + | <table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Alstom</td><td></td></tr><tr><th>Entered service</th><td>July 2025</td><td></td></tr><tr><th>Number ordered</th><td>47 five-car trains</td><td></td></tr><tr><th>Formation</th><td>5 cars, walk-through</td><td></td></tr><tr><th>Cars per train</th><td></td><td>2</td></tr><tr><th>Train length</th><td>85 m (279 ft)</td><td></td></tr><tr><th>Traction</th><td>linear induction motors</td><td></td></tr><tr><th>Electric system</th><td>650 V DC power rail</td><td></td></tr><tr><th>Operation</th><td>driverless (automated)</td><td></td></tr><tr><th>Maximum speed</th><td>80 km/h (50 mph)</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Car length</th><td></td><td>17.35 m (56.9 ft)</td></tr><tr><th>Platform length</th><td></td><td>40 m (131.2 ft)</td></tr></table> | ||
| + | |||
| + | ### In Transitica | ||
| + | |||
| + | Mattupolis Metro's M1 line runs on linear induction motors like Vancouver's Expo Line, so in 2020 Mattupolis joined TransLink's order for Alstom's Mark V. | ||
| + | |||
| + | <p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/SkyTrain_(Vancouver)" rel="noopener">SkyTrain (Vancouver)</a> on Wikipedia.</p> | ||
Revision as of 20:55, 25 November 2026
| M1 | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | M1 |
| Type | Rapid transit |
| Color | #5CA40A |
| Operator | Mattupolis Metro |
| Rolling stock | Vancouver Skytrain (Alstom) Mark V |
| Termini | Northeast Mattupolis Medford |
| Stations | 11 |
| Length | 8,597 blocks (8.6 km) |
| Dimension | minecraft/overworld |
The M1 Line, numbered M1, is a subway line part of Mattupolis Metro in the Transitica Railway Network. It runs between Northeast Mattupolis and Medford, serving 11 stations over about 8.6 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Northeast Mattupolis | 1 | 0.0 | ||
| Mattupolis Hills | ▼1 ▲2 | 0.6 | ||
| North Mattupolis | ![]() | ▼1 ▲2 | 1.2 | |
| Harbourville Park | ![]() | ▼1 ▲2 | 1.9 | |
| Mattupolis Pacific Central | ![]() | ▼4 ▲3 | 2.3 | |
| Mattupolis Arena | ▼2 ▲1 | 2.8 | ||
| East Mattupolis | ▼2 ▲1 | 3.0 | ||
| Southampton | ![]() | ▼2 ▲1 | 3.4 | |
| YMR Airport ✈ | ▼2 ▲1 | 5.0 | ||
| Hastings Junction | ![]() | ▼2 ▲1 | 5.4 | |
| Hastings | ||||
| Hastings Riverside | ||||
| Hastings West | ||||
| Medford | ![]() | ▼3 ▲2 | 8.6 | |
History
The line was first planned as the MTM Mattupolis 1 Line (
), a subway line of the Mattupolis Metro with 11 stations between Northeast Mattupolis and Medford.
Southampton has since been renamed Southhampton.
Operations
- Hastings Junction – Medford corridor: runs express, skipping Hastings, Hastings Riverside and Hastings West; shares the corridor with
Teal line (local) (see Express and local sections). - Shared track with
M3 line between Mattupolis Pacific Central and North Mattupolis (see Interlined lines).
Rolling stock
The line's trains are modelled on the Vancouver Skytrain (Alstom) Mark V (see Transitica rolling stock).

History
The Mark V is the newest train for Vancouver's SkyTrain Expo and Millennium lines, built by Alstom (which took over Bombardier, the maker of the earlier SkyTrain cars). TransLink ordered 41 five-car trains in late 2020 and six more in May 2024, to replace the original 1980s Mark I cars and to add capacity for the Millennium Line's Broadway extension. Testing began in March 2025 and the first train carried passengers in July 2025.
Design and features
Each Mark V is a single five-car train about 85 m long, walk-through from end to end. Like all Expo and Millennium line trains, it runs without a driver and is driven by linear induction motors, which push against an aluminium reaction rail between the running rails, so the trains can climb steep grades and take tight curves quietly.
Specifications
| Real-world train | In Transitica | |
|---|---|---|
| Manufacturer | Alstom | |
| Entered service | July 2025 | |
| Number ordered | 47 five-car trains | |
| Formation | 5 cars, walk-through | |
| Cars per train | 2 | |
| Train length | 85 m (279 ft) | |
| Traction | linear induction motors | |
| Electric system | 650 V DC power rail | |
| Operation | driverless (automated) | |
| Maximum speed | 80 km/h (50 mph) | |
| Track gauge | 1,435 mm (4 ft 8½ in) | |
| Car length | 17.35 m (56.9 ft) | |
| Platform length | 40 m (131.2 ft) |
In Transitica
Mattupolis Metro's M1 line runs on linear induction motors like Vancouver's Expo Line, so in 2020 Mattupolis joined TransLink's order for Alstom's Mark V.
Source: SkyTrain (Vancouver) on Wikipedia.


