Transitica Wikithe Transitica encyclopedia
Log in

Indigo line: Difference between revisions

Revision as of 22:57, 24 November 2026
claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages)
Revision as of 20:55, 25 November 2026
claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica))
Line 5:Line 5:
−
Yard (route profile): "North Clinton"
+
Rolling stock: "MNR M8"
−
Ideal rolling stock: "MNR M8"
---
---
{{route}}
{{route}}
Line 10:Line 9:
## History
## History
 
 
−
In the [[Transitica route profiles]], an older planning document, this line was the '''GTA Indigo Line''' (<img class="chip-img" src="/images/bullet-indigo.png" alt="IN" loading="lazy">), a commuter rail line of the [[Greenfield Transit Authority]] (GTA Commuter Rail) with 15 stations between Grand Central - 42 St and Palma.
+
The line was first planned as the '''GTA Indigo Line''' (<img class="chip-img" src="/images/bullet-indigo.png" alt="IN" loading="lazy">), a commuter rail line of the [[Greenfield Transit Authority]] (GTA Commuter Rail) with 15 stations between Grand Central - 42 St and Palma.
−
 
−
## Route profile
 
 
−
The route profile still matches the line today: the same 16 stations, between the same termini. Some stations have been renamed since: 8 Ave - 50 St → [[8 Av - 50th Street]].
+
8 Ave - 50 St has since been renamed [[8 Av - 50th Street]].
 
 
−
### Operations in the route profile
+
## Operations
 
 
−
- '''Yard:''' North Clinton (see [[Yards and depots]]).
- '''Shared track''' with <a href="/wiki/Maroon_line" class="chip-link" title="Maroon line"><img class="chip-img" src="/images/bullet-maroon.png" alt="MR" loading="lazy"></a> [[Maroon line]] between Ashfield Park and Grand Central - 42 Street (see [[Interlined lines]]).
- '''Shared track''' with <a href="/wiki/Maroon_line" class="chip-link" title="Maroon line"><img class="chip-img" src="/images/bullet-maroon.png" alt="MR" loading="lazy"></a> [[Maroon line]] between Ashfield Park and Grand Central - 42 Street (see [[Interlined lines]]).
- '''Shared track''' with <a href="/wiki/Brown_line" class="chip-link" title="Brown line"><img class="chip-img" src="/images/bullet-brown.png" alt="BR" loading="lazy"></a> [[Brown line]] between Ashfield East and Palma (see [[Interlined lines]]).
- '''Shared track''' with <a href="/wiki/Brown_line" class="chip-link" title="Brown line"><img class="chip-img" src="/images/bullet-brown.png" alt="BR" loading="lazy"></a> [[Brown line]] between Ashfield East and Palma (see [[Interlined lines]]).
 
 
−
## Ideal rolling stock
+
## Rolling stock
−
 
−
The route profile chose this real-world train for the line (see [[Transitica rolling stock]]):
 
 
−
### MNR M8
+
The line's trains are modelled on the '''MNR M8''' (see [[Transitica rolling stock]]).
 
 
![MNR M8](/images/Transitica_MNR_M8.jpg)
![MNR M8](/images/Transitica_MNR_M8.jpg)
 
 
−
- Cars: 3
+
### History
−
- Car Length: 25.9 m (85 ft)
−
- Platform Length: 80 m (262.5 ft)
−
- Manufacturer: KW
−
- Maximum Speed: 129 km/h (100 mph)
−
- Acceleration: 1.1 m/(h*s) (2 mph/s)
−
- Deceleration: 1.3 m/(h*s) (3 mph/s)
−
- Electric system(s): TR, 750 V DC; OW
−
- Other Features:
 
 
+
The M8 was built by Kawasaki for Metro-North's New Haven Line, which runs from Grand Central into Connecticut, and is jointly funded with the Connecticut Department of Transportation. The contract was signed in August 2006 and the cars were built at Yonkers, Lincoln (Nebraska) and Kobe. Technical problems pushed the start of service back from December 2010, and production was held up by steel and subcontractor problems.
+
 
+
The M8 entered service on 1 March 2011, and the original order was completed in July 2015, with a 60-car follow-on order later. The cars replaced the M2, M4 and M6 fleets and also run on the New Canaan Branch and Shore Line East. The fleet is made up of 220 married pairs and 25 single cars.
+
 
+
### Design and features
+
 
+
The M8 can draw power three ways: 750 V DC from third rail in New York, and 12.5 kV and 25 kV AC from the overhead wires in Connecticut, changing over while moving. It has regenerative braking and sealed AC traction motors. Inside it has single-leaf doors, bigger windows, brighter lighting, intercoms, power outlets, LED signs and high-backed seats with headrests, shaped by rider feedback on the M7.
+
 
+
### Specifications
+
 
+
<table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Kawasaki (Yonkers, New York; Lincoln, Nebraska; Kobe)</td><td>Kawasaki</td></tr><tr><th>Delivered</th><td>2010–2015, plus a later 60-car order</td><td></td></tr><tr><th>Entered service</th><td>1 March 2011</td><td></td></tr><tr><th>Number built</th><td>about 471 cars</td><td></td></tr><tr><th>Formation</th><td>married pairs and single cars</td><td></td></tr><tr><th>Cars per train</th><td></td><td>3</td></tr><tr><th>Car length</th><td>25.91 m (85 ft)</td><td>25.9 m (85 ft)</td></tr><tr><th>Width</th><td>3.18 m (10 ft 5 in)</td><td></td></tr><tr><th>Maximum speed</th><td>129 km/h (80 mph) on Metro-North; 161 km/h (100 mph) design</td><td>129 km/h (100 mph)</td></tr><tr><th>Weight</th><td>57.4–64.9 t per car</td><td></td></tr><tr><th>Capacity</th><td>101–114 seated per car</td><td></td></tr><tr><th>Traction</th><td>Mitsubishi IGBT, 8 × 270 hp AC motors per pair</td><td></td></tr><tr><th>Electric system</th><td>750 V DC third rail; 12.5 kV 60 Hz and 25 kV 60 Hz AC overhead</td><td>third rail, 750 V DC; overhead wire</td></tr><tr><th>Platform length</th><td></td><td>80 m (262.5 ft)</td></tr><tr><th>Acceleration</th><td></td><td>1.1 m/(h*s) (2 mph/s)</td></tr><tr><th>Deceleration</th><td></td><td>1.3 m/(h*s) (3 mph/s)</td></tr></table>
+
 
+
### In Transitica
+
 
+
The Indigo line runs from third-rail territory onto overhead wires, so the GTA needed a train that could do both, and the only one on offer was Metro-North's M8, built for the New Haven Line into Connecticut. The GTA joined the Metro-North and Connecticut contract with Kawasaki in 2006; its cars were built at Yonkers and Lincoln and entered service in 2011, changing between third rail and overhead power on the move just as they do in New York.
+
 
+
<p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/M8_(railcar)" rel="noopener">M8 (railcar)</a> on Wikipedia.</p>

Revision as of 20:55, 25 November 2026

Indigo
Line of the Transitica Railway Network
NumberIN
TypeHigh-speed rail
Color #4B0082
OperatorGreenfield Transit Authority
DivisionGTA Commuter Rail
Rolling stockMNR M8
Termini8 Av - 50th Street
GIA Terminal 1 ✈
Stations11
Length9,899 blocks (9.9 km)
Dimensionminecraft/overworld

The Indigo Line, numbered IN, is a commuter rail line part of the Greenfield Transit Authority in the Transitica Railway Network. It runs between 8 Av - 50th Street and GIA Terminal 1 ✈, serving 11 stations over about 9.9 km.

Route

StationConnectionsPlatformskm
8 Av - 50th StreetMR BL▼4 ▲30.0
Ashfield RiverMR CY▼4 ▲31.6
Ensen Center ArenaMR PR▼2 ▲12.5
Melrose ParkwayMR CY▼1 ▲23.2
North ParkMR TL▼2 ▲13.9
North ClintonMR
↔ Clinton YL GY OR
▼1 ▲24.4
Genmar StadiumMR YL GY OR▼B ▲A4.7
Ashfield ParkMR GY OR▼D ▲A5.2
Ashfield EastSL EM BR GY GD GR BG OR▼12 ▲95.9
Ashfield BeachBR▼2 ▲16.9
GIA Terminal 1 ✈RD BR YL PK BL▼B ▲A9.9

History

The line was first planned as the GTA Indigo Line (IN), a commuter rail line of the Greenfield Transit Authority (GTA Commuter Rail) with 15 stations between Grand Central - 42 St and Palma.

8 Ave - 50 St has since been renamed 8 Av - 50th Street.

Operations

Rolling stock

The line's trains are modelled on the MNR M8 (see Transitica rolling stock).

MNR M8

History

The M8 was built by Kawasaki for Metro-North's New Haven Line, which runs from Grand Central into Connecticut, and is jointly funded with the Connecticut Department of Transportation. The contract was signed in August 2006 and the cars were built at Yonkers, Lincoln (Nebraska) and Kobe. Technical problems pushed the start of service back from December 2010, and production was held up by steel and subcontractor problems.

The M8 entered service on 1 March 2011, and the original order was completed in July 2015, with a 60-car follow-on order later. The cars replaced the M2, M4 and M6 fleets and also run on the New Canaan Branch and Shore Line East. The fleet is made up of 220 married pairs and 25 single cars.

Design and features

The M8 can draw power three ways: 750 V DC from third rail in New York, and 12.5 kV and 25 kV AC from the overhead wires in Connecticut, changing over while moving. It has regenerative braking and sealed AC traction motors. Inside it has single-leaf doors, bigger windows, brighter lighting, intercoms, power outlets, LED signs and high-backed seats with headrests, shaped by rider feedback on the M7.

Specifications

Real-world trainIn Transitica
ManufacturerKawasaki (Yonkers, New York; Lincoln, Nebraska; Kobe)Kawasaki
Delivered2010–2015, plus a later 60-car order
Entered service1 March 2011
Number builtabout 471 cars
Formationmarried pairs and single cars
Cars per train3
Car length25.91 m (85 ft)25.9 m (85 ft)
Width3.18 m (10 ft 5 in)
Maximum speed129 km/h (80 mph) on Metro-North; 161 km/h (100 mph) design129 km/h (100 mph)
Weight57.4–64.9 t per car
Capacity101–114 seated per car
TractionMitsubishi IGBT, 8 × 270 hp AC motors per pair
Electric system750 V DC third rail; 12.5 kV 60 Hz and 25 kV 60 Hz AC overheadthird rail, 750 V DC; overhead wire
Platform length80 m (262.5 ft)
Acceleration1.1 m/(h*s) (2 mph/s)
Deceleration1.3 m/(h*s) (3 mph/s)

In Transitica

The Indigo line runs from third-rail territory onto overhead wires, so the GTA needed a train that could do both, and the only one on offer was Metro-North's M8, built for the New Haven Line into Connecticut. The GTA joined the Metro-North and Connecticut contract with Kawasaki in 2006; its cars were built at Yonkers and Lincoln and entered service in 2011, changing between third rail and overhead power on the move just as they do in New York.

Source: M8 (railcar) on Wikipedia.