Transitica Wikithe Transitica encyclopedia
Log in

Cyan line: Difference between revisions

Revision as of 07:35, 25 November 2026
claude (Track layouts per level with real platform sides and switches; fare-zone overlay; drop route profiles)
Revision as of 20:55, 25 November 2026
claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica))
Line 25:Line 25:
−
The M9 is the Long Island Rail Road's newest electric multiple unit, built by Kawasaki and in service since 2019. The married pairs run on 750 V DC third rail and have digital information screens, USB charging points, accessible toilets and security cameras.
+
### History
 
 
−
In Transitica:
+
In 2012 the MTA asked for bids for up to 676 M9 cars for the Long Island Rail Road and Metro-North, and in September 2013 Kawasaki won a contract worth nearly $1.8 billion for a base order of 92 LIRR cars plus options. The cars were built at Yonkers, New York, Lincoln, Nebraska and Kobe, Japan, but defects found in testing and later the COVID-19 pandemic pushed the schedule back by years.
 
 
−
- Cars: 3
+
The first eight-car M9 train entered service on the Port Jefferson Branch on 11 September 2019. The last of the 202 cars arrived in May 2024. Because they made up less than 5% of the fleet for years, riders called them "unicorns". The M9s replaced the LIRR's last M3s.
−
- Car Length: 25.9 m (85 ft)
+
 
−
- Platform Length: 80 m (262.5 ft)
+
### Design and features
−
- Manufacturer: KW
+
 
−
- Maximum Speed: 129 km/h (100 mph)
+
The cars run as married pairs. Compared with the M7 they have wider seats, closed-loop armrests like the M8's, power outlets at every row and four to six extra seats per pair. Each car has four 32-inch screens, destination signs that show which car you are in ("Car 1 of 8"), outside speakers, CCTV and positive train control. Flip-up seats are damped so they don't slam. The M9 uses a Mitsubishi hybrid silicon-carbide IGBT drive with eight 205 kW motors per pair.
−
- Acceleration: 1.1 m/(h*s) (2 mph/s)
+
 
−
- Deceleration: 1.3 m/(h*s) (3 mph/s)
+
### Specifications
−
- Electric system(s): TR, 750 V DC
+
 
−
- Other Features:
+
<table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Kawasaki (Yonkers, New York; Lincoln, Nebraska; Kobe)</td><td>Kawasaki</td></tr><tr><th>Built</th><td>2017–2024</td><td></td></tr><tr><th>Entered service</th><td>11 September 2019</td><td></td></tr><tr><th>Number built</th><td>202 cars</td><td></td></tr><tr><th>Formation</th><td>married pairs</td><td></td></tr><tr><th>Cars per train</th><td></td><td>3</td></tr><tr><th>Operator</th><td>Long Island Rail Road</td><td></td></tr><tr><th>Traction</th><td>Mitsubishi hybrid SiC-IGBT–VVVF, 8 × 205 kW motors per pair</td><td></td></tr><tr><th>Car length</th><td>25.9 m (85 ft)</td><td>25.9 m (85 ft)</td></tr><tr><th>Width</th><td>3.25 m (10 ft 8 in)</td><td></td></tr><tr><th>Height</th><td>3.95 m (12 ft 11.6 in)</td><td></td></tr><tr><th>Maximum speed</th><td>129 km/h (80 mph) in service; 161 km/h (100 mph) design</td><td>129 km/h (100 mph)</td></tr><tr><th>Capacity</th><td>101–111 seated per car</td><td></td></tr><tr><th>Electric system</th><td>750 V DC third rail</td><td>third rail, 750 V DC</td></tr><tr><th>Signalling</th><td>ATC, pulse-code cab signalling, PTC</td><td></td></tr><tr><th>Platform length</th><td></td><td>80 m (262.5 ft)</td></tr><tr><th>Acceleration</th><td></td><td>1.1 m/(h*s) (2 mph/s)</td></tr><tr><th>Deceleration</th><td></td><td>1.3 m/(h*s) (3 mph/s)</td></tr></table>
+
 
+
### In Transitica
+
 
+
The Cyan line's M9s came from the Long Island Rail Road's 2013 order with Kawasaki. The GTA took some of the option cars, built in Yonkers, Lincoln and Kobe, but they were delayed by the same testing defects and the pandemic, so the line's first M9 only carried passengers in 2019. For years they were so rare on the line that riders called them "unicorns", just as on Long Island.
+
 
+
<p class="rs-source">Source: <a href="https://en.wikipedia.org/wiki/M9_(railcar)" rel="noopener">M9 (railcar)</a> on Wikipedia.</p>

Revision as of 20:55, 25 November 2026

Cyan
Line of the Transitica Railway Network
NumberCY
TypeHigh-speed rail
Color #00FFFF
OperatorGreenfield Transit Authority
DivisionGTA Commuter Rail
Rolling stockLIRR M9
TerminiWaterton South
Porto Industrial
Stations40
Length45,615 blocks (45.6 km)
Dimensionminecraft/overworld

The Cyan Line, numbered CY, is a commuter rail line part of the Greenfield Transit Authority in the Transitica Railway Network. It runs between Waterton South and Porto Industrial, serving 40 stations over about 45.6 km.

Route

StationConnectionsPlatformskm
Waterton South▼2 ▲10.0
Waterton East▼2 ▲10.8
Waterton Park▼2 ▲11.3
Waterton Airport ✈▼C ▲D2.1
KitamoriTL▼5 ▲64.2
KaritsukiSL TL▼2 ▲15.7
Chevron Field WestOR <OR>▼4 ▲37.2
Hogwards UpperOR▼2 ▲17.7
Bridge ViewOR▼1 ▲28.3
OxsteadTL OR▼A ▲D8.8
Tranton Union TerminalSL TL PR BL OR▼4 ▲19.3
Eastern WaterfrontTL▼4 ▲19.9
Clark & LakeSA OR <OR>▼2 ▲112.0
State & LakeSA▼2 ▲112.3
Washington & WabashSA▼1 ▲212.7
Adams & WabashSA▼1 ▲213.1
Melrose NorthSL TL BG AZ▼7 ▲814.1
Melrose ParkwayMR IN▼3 ▲415.6
Ashfield RiverMR IN▼1 ▲217.0
West WestwoodRD BL▼3 ▲418.0
Greenfield WestEM▼2 ▲118.8
Westpoint▼2 ▲120.0
OlympiaMR RD SL EM BR GR TL PK▼G ▲F21.3
Greenfield Union TerminalMR SL EM BR YL GY GR TL PR AZ▼G ▲F22.2
DawsonRD YL TL PK▼B ▲C23.7
Dawson EastBL▼2 ▲125.1
Los Llanos Field▼2 ▲126.0
Palma▼1 ▲227.4
Greenfield East▼2 ▲128.8
Midorimachi▼1 ▲232.0
Shinkawara▼1 ▲233.3
Hoshizoraυ▼1 ▲234.0
Sayamaτ υ ι▼5 ▲434.8
Kitanomori▼2 ▲335.6
Nishikikōji▼1 ▲236.7
Higashi-Matsuhamaτ▼3 ▲238.8
Sayama-MinamiΦ Ψ η HY υ ι▼12 ▲1342.3
Castelo do Portoη▼4 ▲344.2
Rua do Parqueη▼1 ▲444.9
Porto Industrialη▼4 ▲145.6

History

The line was first planned as the GTA Cyan Line (CY), a commuter rail line of the Greenfield Transit Authority (GTA Commuter Rail) with 40 stations between Waterton South and Porto Industrial.

Oxstead South has since been renamed Oxstead; Sayama South (佐山南) has since been renamed Sayama-Minami.

Operations

Rolling stock

The line's trains are modelled on the LIRR M9 (see Transitica rolling stock).

LIRR M9

History

In 2012 the MTA asked for bids for up to 676 M9 cars for the Long Island Rail Road and Metro-North, and in September 2013 Kawasaki won a contract worth nearly $1.8 billion for a base order of 92 LIRR cars plus options. The cars were built at Yonkers, New York, Lincoln, Nebraska and Kobe, Japan, but defects found in testing and later the COVID-19 pandemic pushed the schedule back by years.

The first eight-car M9 train entered service on the Port Jefferson Branch on 11 September 2019. The last of the 202 cars arrived in May 2024. Because they made up less than 5% of the fleet for years, riders called them "unicorns". The M9s replaced the LIRR's last M3s.

Design and features

The cars run as married pairs. Compared with the M7 they have wider seats, closed-loop armrests like the M8's, power outlets at every row and four to six extra seats per pair. Each car has four 32-inch screens, destination signs that show which car you are in ("Car 1 of 8"), outside speakers, CCTV and positive train control. Flip-up seats are damped so they don't slam. The M9 uses a Mitsubishi hybrid silicon-carbide IGBT drive with eight 205 kW motors per pair.

Specifications

Real-world trainIn Transitica
ManufacturerKawasaki (Yonkers, New York; Lincoln, Nebraska; Kobe)Kawasaki
Built2017–2024
Entered service11 September 2019
Number built202 cars
Formationmarried pairs
Cars per train3
OperatorLong Island Rail Road
TractionMitsubishi hybrid SiC-IGBT–VVVF, 8 × 205 kW motors per pair
Car length25.9 m (85 ft)25.9 m (85 ft)
Width3.25 m (10 ft 8 in)
Height3.95 m (12 ft 11.6 in)
Maximum speed129 km/h (80 mph) in service; 161 km/h (100 mph) design129 km/h (100 mph)
Capacity101–111 seated per car
Electric system750 V DC third railthird rail, 750 V DC
SignallingATC, pulse-code cab signalling, PTC
Platform length80 m (262.5 ft)
Acceleration1.1 m/(h*s) (2 mph/s)
Deceleration1.3 m/(h*s) (3 mph/s)

In Transitica

The Cyan line's M9s came from the Long Island Rail Road's 2013 order with Kawasaki. The GTA took some of the option cars, built in Yonkers, Lincoln and Kobe, but they were delayed by the same testing defects and the pandemic, so the line's first M9 only carried passengers in 2019. For years they were so rare on the line that riders called them "unicorns", just as on Long Island.

Source: M9 (railcar) on Wikipedia.