Chromium line: Difference between revisions
| Revision as of 20:23, 25 November 2026 claude (Seoul trains: rewrite rolling stock sections from Namu Wiki) | Revision as of 20:55, 25 November 2026 claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica)) | ||
|---|---|---|---|
| Line 32: | Line 32: | ||
| − | <table class="wikitable rs-specs"><tr><th colspan="2">Real-world train</th></tr><tr><th>Manufacturer</th><td>Dawonsys (5th batch)</td></tr><tr><th>Built</th><td>2025–2027 (planned)</td></tr><tr><th>Number ordered</th><td>26 eight-car trains</td></tr><tr><th>Formation</th><td>8 cars</td></tr><tr><th>Traction</th><td>VVVF–IGBT</td></tr><tr><th>Electric system</th><td>1,500 V DC overhead line</td></tr><tr><th>Signalling</th><td>Alstom ATP/ATO, with a driver on board</td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td></tr></table> | + | <table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Dawonsys (5th batch)</td><td></td></tr><tr><th>Built</th><td>2025–2027 (planned)</td><td></td></tr><tr><th>Number ordered</th><td>26 eight-car trains</td><td></td></tr><tr><th>Formation</th><td>8 cars</td><td></td></tr><tr><th>Cars per train</th><td></td><td>4</td></tr><tr><th>Traction</th><td>VVVF–IGBT</td><td></td></tr><tr><th>Electric system</th><td>1,500 V DC overhead line</td><td></td></tr><tr><th>Signalling</th><td>Alstom ATP/ATO, with a driver on board</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Car length</th><td></td><td>19.5 m</td></tr><tr><th>Platform length</th><td></td><td>90 m</td></tr></table> |
### In Transitica | ### In Transitica | ||
| − | How the line's trains are set up in the game: | + | SMRT ordered the Chromium line's trains from Dawonsys at the same time as Seoul Metro's Line 5 fifth batch, and was caught up in the same delivery delays. |
| − | |||
| − | - Cars: 4 | ||
| − | - Car Length: 19.5 m | ||
| − | - Platform Length: 90 m | ||
Revision as of 20:55, 25 November 2026
| Chromium | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | CR |
| Type | Rapid transit |
| Color | #F79B37 |
| Operator | Seogyeong Mass Rapid Transit |
| Rolling stock | Seoul Metro 5000 Series (5th generation) |
| Termini | Jicho Funland - Seogyeong |
| Stations | 4 |
| Length | 1,577 blocks (1.6 km) |
| Dimension | minecraft/overworld |
The Chromium Line, numbered CR, is a subway line part of Seogyeong Mass Rapid Transit in the Transitica Railway Network. It runs between Jicho and Funland - Seogyeong, serving 4 stations over about 1.6 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Jicho | ![]() | ▼A ▲B | 0.0 | |
| Seogyeong | ![]() | ▼C ▲D | 0.2 | |
| Seogyeong South | ▼1 ▲2 | 0.7 | ||
| Funland - Seogyeong | ▼1 ▲2 | 1.6 |
History
The line was first planned as the SMRT Chromium Line (
), a subway line of the Seogyeong Mass Rapid Transit with 4 stations between 지초 (Jicho) and 펀랜드 (Funland).
펀랜드 (Funland) has since been renamed Funland - Seogyeong.
Rolling stock
The line's trains are modelled on the Seoul Metro 5000 Series (5th generation) (see Transitica rolling stock).

History
Seoul Subway Line 5 has 105 eight-car trains (840 cars) of the 5000 series, bought in six batches. Hyundai Precision built the first two batches in 1994–1996 for the line's opening. They were the first and only Korean trains with Swiss ABB inverters, which made them hard to maintain, so Seoul Metro decided to replace them rather than refit them. Hyundai Rotem added trains in 2018 for the Hanam extension, and Woojin Industrial Systems built a fourth batch of 25 trains in 2021–2023 to replace the first-batch trains 501–525; its first train arrived in Seoul on 22 March 2021.
The fifth batch, modelled here, is 26 trains ordered from Dawonsys to replace trains 526–551, with a sixth batch of 25 trains to follow; together they should replace all of the 1990s trains by about 2027–2028. The order has been badly delayed: by January 2024 Dawonsys had completed only 55% of its Line 5 and Line 8 order, and according to Namu Wiki, Seoul Metro later cancelled its train contracts with the company and reported it to the police.
Design and features
Line 5 trains run as eight-car sets on 1,500 V DC overhead lines. The line has had automatic train operation since 1996, but a driver still rides every train in case the system fails. The new trains replace 1990s cars with ABB GTO inverters with modern IGBT drives, LED lighting and information screens, and security cameras; Seoul Metro did not fit CCTV to the old trains because they were about to be replaced.
Specifications
| Real-world train | In Transitica | |
|---|---|---|
| Manufacturer | Dawonsys (5th batch) | |
| Built | 2025–2027 (planned) | |
| Number ordered | 26 eight-car trains | |
| Formation | 8 cars | |
| Cars per train | 4 | |
| Traction | VVVF–IGBT | |
| Electric system | 1,500 V DC overhead line | |
| Signalling | Alstom ATP/ATO, with a driver on board | |
| Track gauge | 1,435 mm (4 ft 8½ in) | |
| Car length | 19.5 m | |
| Platform length | 90 m |
In Transitica
SMRT ordered the Chromium line's trains from Dawonsys at the same time as Seoul Metro's Line 5 fifth batch, and was caught up in the same delivery delays.
Source: 서울교통공사 5000호대 전동차 on Namu Wiki (in Korean).


