Transitica Wikithe Transitica encyclopedia
Log in

Chromium line: Difference between revisions

Revision as of 03:21, 24 November 2026
claude (Add the Transitica route-profile document (outdated) to the wiki)
Revision as of 20:55, 25 November 2026
claude (Rolling stock: in-game train settings merged into the specifications table (real world vs In Transitica))
Line 1:Line 1:
+
---
+
infobox:
+
Operator: "[[Seogyeong Mass Rapid Transit]]"
+
Rolling stock: "Seoul Metro 5000 Series (5th generation)"
+
---
+
{{route}}
+
 
## History
## History
 
 
−
In the [[Transitica]] plan, an older route-profile document for this world that is now out of date, this line was the '''SMRT Chromium Line''' (<span class="chip" style="background:#f79b37;color:#fff;border-radius:.8em;min-width:1.6em">CR</span>), a subway line of the [[Seogyeong Mass Rapid Transit]] with 4 stations between 지초 (Jicho) and 펀랜드 (Funland). Its ideal rolling stock was the Seoul Metro 5000 Series (5th generation) (4 cars).
+
The line was first planned as the '''SMRT Chromium Line''' (<img class="chip-img" src="/images/bullet-chromium.png" alt="CR" loading="lazy">), a subway line of the [[Seogyeong Mass Rapid Transit]] with 4 stations between 지초 (Jicho) and 펀랜드 (Funland).
 
 
−
The full old route profile is at [[Chromium line (Transitica)]].
+
펀랜드 (Funland) has since been renamed [[Funland - Seogyeong]].
+
 
+
## Rolling stock
+
 
+
The line's trains are modelled on the '''Seoul Metro 5000 Series (5th generation)''' (see [[Transitica rolling stock]]).
+
 
+
![Seoul Metro 5000 Series (5th generation)](/images/Transitica_Seoul_Metro_5000_Series_5th_generation.jpg)
+
 
+
### History
+
 
+
Seoul Subway Line 5 has 105 eight-car trains (840 cars) of the 5000 series, bought in six batches. Hyundai Precision built the first two batches in 1994–1996 for the line's opening. They were the first and only Korean trains with Swiss ABB inverters, which made them hard to maintain, so Seoul Metro decided to replace them rather than refit them. Hyundai Rotem added trains in 2018 for the Hanam extension, and Woojin Industrial Systems built a fourth batch of 25 trains in 2021–2023 to replace the first-batch trains 501–525; its first train arrived in Seoul on 22 March 2021.
+
 
+
The fifth batch, modelled here, is 26 trains ordered from Dawonsys to replace trains 526–551, with a sixth batch of 25 trains to follow; together they should replace all of the 1990s trains by about 2027–2028. The order has been badly delayed: by January 2024 Dawonsys had completed only 55% of its Line 5 and Line 8 order, and according to Namu Wiki, Seoul Metro later cancelled its train contracts with the company and reported it to the police.
+
 
+
### Design and features
+
 
+
Line 5 trains run as eight-car sets on 1,500 V DC overhead lines. The line has had automatic train operation since 1996, but a driver still rides every train in case the system fails. The new trains replace 1990s cars with ABB GTO inverters with modern IGBT drives, LED lighting and information screens, and security cameras; Seoul Metro did not fit CCTV to the old trains because they were about to be replaced.
+
 
+
### Specifications
+
 
+
<table class="wikitable rs-specs rs-compare"><tr><th></th><th>Real-world train</th><th>In Transitica</th></tr><tr><th>Manufacturer</th><td>Dawonsys (5th batch)</td><td></td></tr><tr><th>Built</th><td>2025–2027 (planned)</td><td></td></tr><tr><th>Number ordered</th><td>26 eight-car trains</td><td></td></tr><tr><th>Formation</th><td>8 cars</td><td></td></tr><tr><th>Cars per train</th><td></td><td>4</td></tr><tr><th>Traction</th><td>VVVF–IGBT</td><td></td></tr><tr><th>Electric system</th><td>1,500 V DC overhead line</td><td></td></tr><tr><th>Signalling</th><td>Alstom ATP/ATO, with a driver on board</td><td></td></tr><tr><th>Track gauge</th><td>1,435 mm (4 ft 8½ in)</td><td></td></tr><tr><th>Car length</th><td></td><td>19.5 m</td></tr><tr><th>Platform length</th><td></td><td>90 m</td></tr></table>
+
 
+
### In Transitica
+
 
+
SMRT ordered the Chromium line's trains from Dawonsys at the same time as Seoul Metro's Line 5 fifth batch, and was caught up in the same delivery delays.
+
 
+
<p class="rs-source">Source: <a href="https://namu.wiki/w/%EC%84%9C%EC%9A%B8%EA%B5%90%ED%86%B5%EA%B3%B5%EC%82%AC%205000%ED%98%B8%EB%8C%80%20%EC%A0%84%EB%8F%99%EC%B0%A8" rel="noopener">서울교통공사 5000호대 전동차</a> on Namu Wiki (in Korean).</p>

Revision as of 20:55, 25 November 2026

Chromium
Line of the Transitica Railway Network
NumberCR
TypeRapid transit
Color #F79B37
OperatorSeogyeong Mass Rapid Transit
Rolling stockSeoul Metro 5000 Series (5th generation)
TerminiJicho
Funland - Seogyeong
Stations4
Length1,577 blocks (1.6 km)
Dimensionminecraft/overworld

The Chromium Line, numbered CR, is a subway line part of Seogyeong Mass Rapid Transit in the Transitica Railway Network. It runs between Jicho and Funland - Seogyeong, serving 4 stations over about 1.6 km.

Route

StationConnectionsPlatformskm
JichoTI▼A ▲B0.0
SeogyeongVD ZU▼C ▲D0.2
Seogyeong South▼1 ▲20.7
Funland - Seogyeong▼1 ▲21.6

History

The line was first planned as the SMRT Chromium Line (CR), a subway line of the Seogyeong Mass Rapid Transit with 4 stations between 지초 (Jicho) and 펀랜드 (Funland).

펀랜드 (Funland) has since been renamed Funland - Seogyeong.

Rolling stock

The line's trains are modelled on the Seoul Metro 5000 Series (5th generation) (see Transitica rolling stock).

Seoul Metro 5000 Series (5th generation)

History

Seoul Subway Line 5 has 105 eight-car trains (840 cars) of the 5000 series, bought in six batches. Hyundai Precision built the first two batches in 1994–1996 for the line's opening. They were the first and only Korean trains with Swiss ABB inverters, which made them hard to maintain, so Seoul Metro decided to replace them rather than refit them. Hyundai Rotem added trains in 2018 for the Hanam extension, and Woojin Industrial Systems built a fourth batch of 25 trains in 2021–2023 to replace the first-batch trains 501–525; its first train arrived in Seoul on 22 March 2021.

The fifth batch, modelled here, is 26 trains ordered from Dawonsys to replace trains 526–551, with a sixth batch of 25 trains to follow; together they should replace all of the 1990s trains by about 2027–2028. The order has been badly delayed: by January 2024 Dawonsys had completed only 55% of its Line 5 and Line 8 order, and according to Namu Wiki, Seoul Metro later cancelled its train contracts with the company and reported it to the police.

Design and features

Line 5 trains run as eight-car sets on 1,500 V DC overhead lines. The line has had automatic train operation since 1996, but a driver still rides every train in case the system fails. The new trains replace 1990s cars with ABB GTO inverters with modern IGBT drives, LED lighting and information screens, and security cameras; Seoul Metro did not fit CCTV to the old trains because they were about to be replaced.

Specifications

Real-world trainIn Transitica
ManufacturerDawonsys (5th batch)
Built2025–2027 (planned)
Number ordered26 eight-car trains
Formation8 cars
Cars per train4
TractionVVVF–IGBT
Electric system1,500 V DC overhead line
SignallingAlstom ATP/ATO, with a driver on board
Track gauge1,435 mm (4 ft 8½ in)
Car length19.5 m
Platform length90 m

In Transitica

SMRT ordered the Chromium line's trains from Dawonsys at the same time as Seoul Metro's Line 5 fifth batch, and was caught up in the same delivery delays.

Source: 서울교통공사 5000호대 전동차 on Namu Wiki (in Korean).