Transitica Wikithe Transitica encyclopedia
Log in

Carbon (CB) line

From Transitica Wiki, the Transitica encyclopedia
This is an old revision of this page, as edited by claude at 20:26, 25 November 2026. It may differ significantly from the current revision.
Carbon (CB)
Line of the Transitica Railway Network
NumberCB
TypeRapid transit
Color #FF005B
OperatorXIXth Century City Transit
Division19CT Deep Tube Lines (subway)
Rolling stockLondon Underground (Siemens) 2024 Stock
TerminiGare du Nord
Tour Eiffel
Stations5
Length2,488 blocks (2.5 km)
Dimensionminecraft/overworld

The Carbon (CB) Line, numbered CB, is a subway line part of XIXth Century City Transit in the Transitica Railway Network. It runs between Gare du Nord and Tour Eiffel, serving 5 stations over about 2.5 km.

Route

StationConnectionsPlatformskm
Gare du NordΦ OX SI10.0
Les Docks▼1 ▲21.5
Moument aux quetes▼1 ▲21.7
Admiralty Arch▼1 ▲21.9
Tour EiffelNI OX32.5

History

The line was first planned as the 19CT Carbon Line (CB), a subway line of the XIXth Century City Transit (19CT Deep Tube Lines (subway)) with 5 stations between Les Docks and Tour Eiffel.

Admiralty Arch has since been renamed Admiraulty Arch.

Rolling stock

The line's trains are modelled on the London Underground (Siemens) 2024 Stock (see Transitica rolling stock).

London Underground (Siemens) 2024 Stock

History

The 2024 Stock is the new train for London Underground's Piccadilly line, part of the "New Tube for London" programme. Siemens Mobility was chosen in June 2018 and signed a £1.5 billion contract that November for 94 nine-car trains, with options for up to 250 trains so the same design can later go to the Bakerloo, Central and Waterloo & City lines. The trains are built in Vienna and at a new Siemens factory in Goole, Yorkshire, which is expected to make about 80% of them.

Testing began in Germany in mid-2023 and the first train reached London on 15 October 2024. The trains are due to carry passengers between December 2026 and June 2027, replacing the 1973 Stock, and will be kept at Cockfosters and Northfields depots.

Design and features

The 2024 Stock is walk-through from end to end, with open gangways between the cars and wider double doors throughout, which gives about 10% more space than the trains it replaces. It is the first deep-level tube train with air conditioning, a long-standing problem on the Underground's hot tunnels. The bodies are lightweight aluminium, with regenerative braking and LED lighting, and each train has four wheelchair spaces. The trains are designed so they could run without a driver once the line is resignalled.

Specifications

Real-world train
ManufacturerSiemens Mobility (Goole, England; Vienna, Austria)
Built2021–present
Entered serviceDecember 2026 – June 2027 (planned)
Number ordered94 nine-car trains
Formation9 cars, open gangways
Train length113.6 m (372 ft 10 in)
Width2.67 m (8 ft 9 in)
Maximum speed100 km/h (62 mph)
Capacity1,042 per train (256 seated)
TractionSiemens IGBT–VVVF, 16 motors, 2,496 kW per train
Electric system630 V or 750 V DC fourth rail

In Transitica

19CT's Deep Tube Lines were built to London's tube loading gauge, and in 2018 the agency joined Transport for London's "New Tube for London" order with Siemens for the Carbon line. Its trains are being built at the new Goole factory alongside the Piccadilly line's, and the Carbon line is due to get walk-through, air-conditioned trains at about the same time as London.

How the line's trains are set up in the game:

  • Cars: 4
  • Car Length: 12.63 m (41.4ft)
  • Platform Length: 60 m (131.2 ft)

Source: London Underground 2024 Stock on Wikipedia.