Carbon (CB) line
| Carbon (CB) | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | CB |
| Type | Rapid transit |
| Color | #FF005B |
| Operator | XIXth Century City Transit |
| Division | 19CT Deep Tube Lines (subway) |
| Rolling stock | London Underground (Siemens) 2024 Stock |
| Termini | Gare du Nord Tour Eiffel |
| Stations | 5 |
| Length | 2,488 blocks (2.5 km) |
| Dimension | minecraft/overworld |
The Carbon (CB) Line, numbered CB, is a subway line part of XIXth Century City Transit in the Transitica Railway Network. It runs between Gare du Nord and Tour Eiffel, serving 5 stations over about 2.5 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Gare du Nord | | 1 | 0.0 | |
| Les Docks | ▼1 ▲2 | 1.5 | ||
| Moument aux quetes | ▼1 ▲2 | 1.7 | ||
| Admiralty Arch | ▼1 ▲2 | 1.9 | ||
| Tour Eiffel | ![]() | 3 | 2.5 |
History
The line was first planned as the 19CT Carbon Line (
), a subway line of the XIXth Century City Transit (19CT Deep Tube Lines (subway)) with 5 stations between Les Docks and Tour Eiffel.
Admiralty Arch has since been renamed Admiraulty Arch.
Rolling stock
The line's trains are modelled on the London Underground (Siemens) 2024 Stock (see Transitica rolling stock).

History
The 2024 Stock is the new train for London Underground's Piccadilly line, part of the "New Tube for London" programme. Siemens Mobility was chosen in June 2018 and signed a £1.5 billion contract that November for 94 nine-car trains, with options for up to 250 trains so the same design can later go to the Bakerloo, Central and Waterloo & City lines. The trains are built in Vienna and at a new Siemens factory in Goole, Yorkshire, which is expected to make about 80% of them.
Testing began in Germany in mid-2023 and the first train reached London on 15 October 2024. The trains are due to carry passengers between December 2026 and June 2027, replacing the 1973 Stock, and will be kept at Cockfosters and Northfields depots.
Design and features
The 2024 Stock is walk-through from end to end, with open gangways between the cars and wider double doors throughout, which gives about 10% more space than the trains it replaces. It is the first deep-level tube train with air conditioning, a long-standing problem on the Underground's hot tunnels. The bodies are lightweight aluminium, with regenerative braking and LED lighting, and each train has four wheelchair spaces. The trains are designed so they could run without a driver once the line is resignalled.
Specifications
| Real-world train | |
|---|---|
| Manufacturer | Siemens Mobility (Goole, England; Vienna, Austria) |
| Built | 2021–present |
| Entered service | December 2026 – June 2027 (planned) |
| Number ordered | 94 nine-car trains |
| Formation | 9 cars, open gangways |
| Train length | 113.6 m (372 ft 10 in) |
| Width | 2.67 m (8 ft 9 in) |
| Maximum speed | 100 km/h (62 mph) |
| Capacity | 1,042 per train (256 seated) |
| Traction | Siemens IGBT–VVVF, 16 motors, 2,496 kW per train |
| Electric system | 630 V or 750 V DC fourth rail |
In Transitica
How the line's trains are set up in the game:
- Cars: 4
- Car Length: 12.63 m (41.4ft)
- Platform Length: 60 m (131.2 ft)
Source: London Underground 2024 Stock on Wikipedia.


