Calcium line: Difference between revisions
| Revision as of 22:57, 24 November 2026 claude (Route profiles merged into line pages; agency, yard, express/local, interlining, world and airport pages) | Revision as of 07:35, 25 November 2026 claude (Track layouts per level with real platform sides and switches; fare-zone overlay; drop route profiles) | ||
|---|---|---|---|
| Line 5: | Line 5: | ||
| − | Ideal rolling stock: "JR East E231-800 Series" | + | Rolling stock: "JR East E231-800 Series" |
--- | --- | ||
{{route}} | {{route}} | ||
| Line 9: | Line 9: | ||
## History | ## History | ||
| − | In the [[Transitica route profiles]], an older planning document, this line was the '''MBTA Calcium Line''' (<img class="chip-img" src="/images/bullet-calcium.png" alt="CA" loading="lazy">), a commuter rail line of the [[Massachusetts Bay Transit Authority]] (MBTA Conventional Rail (commuter rail)) with 6 stations between Boston South Station 🚆 and Pankow Airport Fuel Farm. | + | The line was first planned as the '''MBTA Calcium Line''' (<img class="chip-img" src="/images/bullet-calcium.png" alt="CA" loading="lazy">), a commuter rail line of the [[Massachusetts Bay Transit Authority]] (MBTA Conventional Rail (commuter rail)) with 6 stations between Boston South Station 🚆 and Pankow Airport Fuel Farm. |
| − | |||
| − | ## Route profile | ||
| − | The route profile still matches the line today: the same 6 stations, between the same termini. | + | ## Rolling stock |
| − | ## Ideal rolling stock | + | The line's trains are modelled on the '''JR East E231-800 Series''' (see [[Transitica rolling stock]]). |
| − | The route profile chose this real-world train for the line (see [[Transitica rolling stock]]): | + |  |
| − | ### JR East E231-800 Series | + | The E231-800 series runs on JR East's Chūō–Sōbu line through onto the Tokyo Metro Tōzai Line, delivered in 2003. Its cars are narrower than other E231s so that they fit the subway's tunnels. |
| − |  | + | In Transitica: |
- Cars: 2 | - Cars: 2 | ||
- Car Length: 20 m (65.6 ft) | - Car Length: 20 m (65.6 ft) | ||
- Platform Length: 30 m (98.4 ft) | - Platform Length: 30 m (98.4 ft) | ||
| − | |||
Revision as of 07:35, 25 November 2026
| Calcium | |
|---|---|
| Line of the Transitica Railway Network | |
![]() | |
| Number | CA |
| Type | High-speed rail |
| Color | #A5AA9D |
| Operator | Massachusetts Bay Transit Authority |
| Division | MBTA Conventional Rail (commuter rail) |
| Rolling stock | JR East E231-800 Series |
| Termini | Pankow Airport Fuel Farm Boston South Station |
| Stations | 6 |
| Length | 5,786 blocks (5.8 km) |
| Dimension | minecraft/overworld |
The Calcium Line, numbered CA, is a commuter rail line part of the Massachusetts Bay Transit Authority in the Transitica Railway Network. It runs between Pankow Airport Fuel Farm and Boston South Station, serving 6 stations over about 5.8 km.
Route
| Station | Connections | Platforms | km | |
|---|---|---|---|---|
| Pankow Airport Fuel Farm | ▼1 ▲2 | 0.0 | ||
| Pankow Airport Terminal A ✈ | ▼2 ▲1 | 0.4 | ||
| Pankow Airport Terminal B ✈ | ▼2 ▲1 | 2.8 | ||
| Machesterford West | ▼2 ▲1 | 4.0 | ||
| Machesterford East | ![]() | ▼3 ▲2 | 5.1 | |
| Boston South Station | ![]() | 2 | 5.8 |
History
The line was first planned as the MBTA Calcium Line (
), a commuter rail line of the Massachusetts Bay Transit Authority (MBTA Conventional Rail (commuter rail)) with 6 stations between Boston South Station 🚆 and Pankow Airport Fuel Farm.
Rolling stock
The line's trains are modelled on the JR East E231-800 Series (see Transitica rolling stock).

The E231-800 series runs on JR East's Chūō–Sōbu line through onto the Tokyo Metro Tōzai Line, delivered in 2003. Its cars are narrower than other E231s so that they fit the subway's tunnels.
In Transitica:
- Cars: 2
- Car Length: 20 m (65.6 ft)
- Platform Length: 30 m (98.4 ft)


